Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 05, 2025 SAM #8592
SOURCES SOUGHT

13 -- 155MM Artillery M795 Metal Parts Assembly Market Survey

Notice Date
6/3/2025 9:34:12 AM
 
Notice Type
Sources Sought
 
NAICS
332993 — Ammunition (except Small Arms) Manufacturing
 
Contracting Office
W6QK ACC-PICA PICATINNY ARSENAL NJ 07806-5000 USA
 
ZIP Code
07806-5000
 
Solicitation Number
W15QKN-25-X-17PX
 
Response Due
7/15/2025 2:00:00 PM
 
Archive Date
07/30/2025
 
Point of Contact
Christopher Bartow, Amy Sentner
 
E-Mail Address
christopher.j.bartow.civ@army.mil, amy.sentner.civ@army.mil
(christopher.j.bartow.civ@army.mil, amy.sentner.civ@army.mil)
 
Description
IMPORTANT INFORMATION: This market survey is for informational and planning purposes only and shall NOT be construed as a Request for Proposal; therefore, no contract will be awarded from this announcement. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. This notice is not to be construed as a commitment by the Government for any purpose other than market research. REQUIREMENT: The U.S. Army Contracting Command-New Jersey (ACC-NJ) on behalf of the Office of the Project Manager for Combat Ammunition Systems (PM CAS) both located at Picatinny Arsenal, New Jersey is conducting market research to identify potential sources within United States and Canada, capable of manufacturing and delivering the 155mm Artillery M795 Metal Parts Assembly (hereafter referred to as �M795 Metal Parts�). The purpose of this market survey is to obtain current information on the capability of potential sources to deliver M795 Metal Parts at a rate of no less than 5,000 per month. The 155mm M795 Metal Part is made from a high fragmentation steel alloy (HF-1), has a finished weight of approximately 75 lbs., is a forged metal part approximately 30 inches long, and has a curved exterior. In addition, the M795 utilizes a welded rotating band that encircles the body close to the base. The M795 Metal Part is phosphated with both its internal cavity and exterior receiving a layer of paint. For storage and transport, a lifting plug is threaded into the nose cavity and a flexible cover is installed over the rotating band. The metal parts are palletized and provided to the Load Assemble Pack manufacturer for further processing. All interested sources must be registered in the System for Award Management (SAM) in order to provide a response. Responses shall include the following information for the Government�s review and assessment: a. Company's contact information including organization�s name, address, point of contact, phone number, fax number, e-mail address, business size, taxpayer identification number, Unique Entity ID and CAGE Code (as applicable); b. A summary that includes a brief description of the contractor's capabilities to include parent organizations, name/address/point of contact identification/email address, capabilities; c. Past manufacturing experience with artillery metal parts (105mm and 155mm) or similar scope(s) of work within the last 10 years; d. Identify projected monthly delivery capabilities and lead time for the delivery of M795 Metal Parts. Responses should identify the key pieces of equipment with lead times required to manufacture, test, and inspect product in conformance to the technical data package, inclusive of the forging, machining, rotating band welding, heat treating, ultrasonic testing, phosphating, and painting processes. Responses should address the capability to consistently meet the Government's required monthly production of no less than 5,000 M795 Metal Parts per month, as well as minimum sustaining and maximum capacity rates. e. A description of facilities, equipment including key specifications or capabilities, manufacturing processes, inspection (destructive and non-destructive) capabilities, personnel, past experience as an artillery metal parts producer or a systems contractor, proven monthly production capacity and/or potential capability, and possible partnering/teaming arrangements. Responses should include how the aforementioned factors relate to the specific technical requirements of M795 Metal Parts. f. Evidence of Quality Assurance in order to support M795 Metal Parts production. Responses shall not exceed 15 pages in length and should provide sufficient detail for the U.S. Government to make a reasonable assessment regarding your company�s capability to produce this item at the required rate. NO CLASSIFIED information shall be submitted. Please identify any proprietary information submitted. All information provided will not be returned and will be held in confidential status. The Technical Data Package (TDP) for the M795 Metal Parts is available for informational purposes upon request and receipt of all required documents. Technical data is marked Distribution D; therefore, data distribution is only authorized to the Department of Defense (DoD) and U.S. DoD contractors. Foreign sources may receive the technical data pending PM CAS approval. PM CAS reserves the right to deny the release of technical data to any source at its discretion. DoD and U.S. DoD contractors interested in receiving a copy of the TDP are required to submit a signed and completed DD Form 2345, Militarily Critical Technical Data Agreement; AMSTA-AR Form 1350, Technical Data Request Questionnaire; and Non-Disclosure Agreement for the Government's consideration. Interested sources shall not reproduce, duplicate, or copy the TDPs, or any portion thereof, except to the extent necessary for, and then only in connection with the preparation and/or submission of a capability statement related to this sources sought notice. This rule applies to distribution of the TDPs to all subcontractors at every level. Upon completion of the purposes for which Government Technical Data has been provided, the contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the contractor. Destruction of this Technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files. Within three-days after this notice expires, the contractor will notify the point of contact confirming destruction of all Government-provided technical data and certify that no copies were retained.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9dc971871cb740cc85d56648865e846c/view)
 
Record
SN07464714-F 20250605/250603230054 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.