Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 13, 2025 SAM #8539
SOLICITATION NOTICE

Y -- 590-25-701 | Design EHRM Data Center | Hampton, VA |

Notice Date
4/11/2025 4:12:44 AM
 
Notice Type
Presolicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
PCAC (36C776) INDEPENDENCE OH 44131 USA
 
ZIP Code
44131
 
Solicitation Number
36C77625R0054
 
Response Due
5/5/2025 12:00:00 PM
 
Archive Date
07/04/2025
 
Point of Contact
Andrew Mathews, Contract Specialist, Phone: 216-707-7715
 
E-Mail Address
Andrew.Mathews2@va.gov
(Andrew.Mathews2@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
Paragraph 4(A)(2) which reads: Submissions in Section F shall include no more and no less than five (5) recent and relevant Government and private experience projects similar in size scope and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the attached Statement of Work and this notice. Recent is defined as AE services provided on projects that have ended (construction is complete, or construction was N/A) within the past five (5) years. At least two projects must have been completed by the SDVOSB proposing as Prime for this project; all projects cannot be from standalone subcontractors. Is changed to read: Submissions in Section F shall include no more and no less than five (5) recent and relevant Government and private experience projects similar in size scope and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the attached Statement of Work and this notice. Recent is defined as AE services provided on projects that have ended (design is complete) within the past five (5) years. At least two projects must have been completed by the SDVOSB proposing as Prime for this project; all projects cannot be from standalone subcontractors. RFI Log With our experience on multiple EHRM projects, we feel that we are highly qualified for this project. However, we feel the requirement for projects to be 100% construction complete limits our ability to showcase our specialized expertise. Considering the EHRM Program is still fairly new and the majority of EHRM projects are not yet complete with construction, would the VA consider removing the requirement for projects to be construction complete? VA Response: Requirement has been updated to design complete. Please see the above language. For the Professional Qualifications requirement to include documentation that demonstrates we ve discussed this opportunity with each subcontractor, and they ve agreed to submitting a Part II, will the inclusion of their signed Part II cover this requirement? If not, can the VA please clarify what documentation in particular they want to see here? VA Response:� Please follow guidance in the professional qualification s selection criteria issued out in the request for SF330s Page 12 states that each page of the SF 330 must be in black ink (no gray, no colors). The restriction to black ink and no gray shading limits our ability to emphasize key information via charts and graphs in Section H. Would the VA consider allowing gray ink for graphics in Section H? VA Response: No. All ink must be black. In the submission requirements, you state we can only use the forms from GSA.gov.� As you are aware, these forms are very cumbersome to use with no ability to expand the boxes, and not able to jump to the next page in section H.� Because of this, most companies have created their own version of this form.� If we follow all of the requirements stated in the solicitation regarding color, font, spacing, and margins, can we use a modified version of this form?� � VA Response: Yes as long as it is in the GSA SF330 format. You have requested proof of a PPQ request if a completed PPQ was not received.� Can you expand on what you consider proof? VA Response: Date and time the request was made, to whom it was made and a statement from the offeror saying it was not received. You have requested the Section F projects be Construction Complete. As you are aware, there are very few EHRM projects where the construction is complete, and the Construction schedules are multiple years.� Would you consider design complete for this requirement to allow projects� that are relevant to this scope of work? VA Response: Requirement has been updated to design complete. Please see the above language.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/db1f98a60cea4f888c11921857809e74/view)
 
Place of Performance
Address: Hampton VA Medical Center 100 Emancipation Drive, Hampton, VA 23667, USA
Zip Code: 23667
Country: USA
 
Record
SN07406208-F 20250413/250411230054 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.