|
COMMERCE BUSINESS DAILY ISSUE OF JULY 28,1999 PSA#2397HQ CPSG/RMK, 230 Hall Blvd, Suite 114, San Antonio TX 78243-7056 D -- IMPLEMENTATION OF PUBLIC KEY INFRASTRUCTURE (PKI) SOL
F19628-99-Q-72080 DUE 073099 POC Jeffrey Hardin, 210-977-3154 WEB: ESC
Business Opportunities Web Page, http://www.herbb.hanscom.af.mil.
E-MAIL: Click Here to E-mail the POC, jeffrey.hardin@kelly.af.mil.
SOURCES SOUGHT SYNOPSIS FOR IMPLEMENTATION OF PUBLIC KEY INFRASTRUCTURE
(PKI). This announcement is limited to Information Technology Services
Program (ITSP) BPA holders only. See the website at
http://herbb.hanscom.af.mil/rfq.asp=R10 for the list of current ITSP
BPA holders. 1. The Electronic Systems Center (ESC), Information
Assurance (IA) Product Area Directorate (PAD), San Antonio, Texas,
requires Contractor support to provide the following: administrative
support for new system program office (SPO); training support for local
registration authority (LRA) personnel; technical support for
implementing DoD PKI for the Air Force and technical support for
implementing Air Force applications; providing engineering services;
integrating future DoD PKI architectures; development and execution of
application testing. 2. This requirement is limited to ITSP BPA
holders only. Please advise if your company would be able to provide
contract support for the requirement identified below by 2 Aug 99. At
that time,those organizations that respond will be sent a draft
Statement of Objectives (SOO). Questions will be accepted on the draft
SOO until 10 Aug 99 and will be addressed at a bidder's conference on
20 Aug 99. The bidder's conference will be held in the Duncan Center
on Kelly Air Force Base, Texas from 8:00-11:00 a.m. Skills and
Qualifications: Staff support: Ability to perform administrative
support functions such as: recording and publishing meeting minutes,
presentation preparation, correspondence coordination, and suspense
tracking. Administrative skills required (e.g. computer entry; note
taking, phone skills, thorough knowledge of office automation tools).
Estimated 2 persons needed. Trainer: Experience in providing hands-on
training. Training is required for PKI local registration authority and
issuance of user certificates. Develop/modify course material.
Coordinate training schedules. Involves travel. Provide program
briefings. Formal instructor experience and technical background
required. Estimate 2 persons required. Technical support: Systems
Engineer/Designer/Integrator/Tester: Experienced in system level
structured analysis, design, and documentation of computer software
application; specific experience with public key infrastructure
required; recent specific experience in the development of test plans,
execution of tests, and documentation of results; thorough knowledge
of operating systems and networking; recent specific experience in NT
programming is a plus; experience with legacy application integration;
demonstrated ability to work alone with minimal technical supervision;
traveling required. Estimate 10 persons required. Registration support:
Computer Specialist: General experience in programming NT workstations
and networking; strong hardware skills; extensive travel
(international and continental US) two to three weeks a month. Estimate
12 persons required. Trusted Agent Support: Performs administrative
support functions: verifies user identification, initializes chain of
trust, ensures properdocumentation is coordinated and filed
appropriately; extensive travel (international and continental US) two
to three weeks a month. Estimate 36 persons required. Place of
Performance: Work required of the contractor shall be performed at SPO
location or contractor provided facility within 15-20 minutes of the
SPO facility. SPO location is still being determined. Optimum option
for the location of SPO is to co-locate contractor staff with
government staff within the CPSG facilities located at Kelly AFB, San
Antonio, Texas. Alternate option for the location of SPO will be for
contractor to provide facilities for the SPO. Normal duty hours are
0730-1630. Normal duty days are Monday through Friday, exclusive of
federal holidays. NOTE: If SPO facility is located within the CPSG
compound area, final security clearance will be required by contractor
personnel as required by the contract DD form 254. Period of
Performance: One year basic period with one-year option. Special
Requirements: Each contractor employee working on this task shall (1)
be a United States citizen, (2) Systems
engineer/designer/integrator/tester personnel shall have a final SECRET
security clearance, other personnel shall under go a NAC check, and (3)
maintain this clearance throughout the life of the contract. Contractor
must be available to begin work 25 Oct 99. Posted 07/26/99
(D-SN359061). (0207) Loren Data Corp. http://www.ld.com (SYN# 0024 19990728\D-0007.SOL)
D - Automatic Data Processing and Telecommunication Services Index Page
|
|