Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 2,1998 PSA#2233

US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000

13 -- PRODUCE 300 M795 HF1 PROJECTILES SOL DAAE30-99-Q-0104 DUE 121498 POC Carolyn Schwierk,Contract Specialist,(973)724-5369 WEB: US ARMY TACOM-ARDEC Procurement Network, http://procnet.pica.army.mil/cbd/RFP/99Q0104/99Q0104.htm. E-MAIL: Carolyn Schwierk, schwierk@pica.army.mil. The U.S. Army, TACOM-ARDEC has a requirement for 300 rough machined M795 HF1 projectiles in accordance with drawing SK00001 and 1212977199 and deliver to the ARDEC Welding Technology Center. After ARDEC welds and stress relieves, the projectiles shall be shipped to the contractor to complete the M795 manufacturing process. At the end of the process, the contractor shall deliver a minimum of 100 finished projectiles with nickel rotating bands, a minimum of 100 projectiles with stainless steel rotating bands, and the remainder with gilding metal rotating bands. The parts furnished under this statement of work shall be delivered under the requirement of the M795 Product Specification, MIL-P-63245B, Amendment 3, Projectile, HE, 155mm, M795 Metal Parts Assembly, with the exception of the rotating band seat and final band dimensions, which are specified by drawing numbers SK00001 and SK00003 respectively. ARDEC will be responsible for welding the rotating bands and for the post weld stress relief at the ARDEC Welding Technology Center. The contractor shall maintain serial numbers throughout the entire manufacturing process. All 300 projectiles shall be from the same heat of steel. The contractor shall be responsible for packaging and shipping costs to deliver 300 projectiles to the ARDEC Welding Technology Center, and shall notify government personnel two days prior to shipment of parts on specific delivery time. Contractor shall deliver 300 rough machined projectile forgings to ARDEC 30 days after contract award, ARDEC will deliver welded and stress relieved projectiles 60 days after contract award. The contractor shall complete heat treatment, nosing, finish machining, and inspection 90 days after contract award, and shall deliver accepted parts to Yuma Proving Ground 104 days after contract award. This solicitation will be available for downloading from the World Wide Web Electronic Commerce Home Page available at the following address: "http://procnet.pica.army.mil." The Government intends to utilize Chamberlain Manufacturing Corporation located in Rock Island, Il in a new contractual action. See Notes 22 and 26. Posted 11/30/98 (D-SN275403). (0334)

Loren Data Corp. http://www.ld.com (SYN# 0055 19981202\13-0001.SOL)


13 - Ammunition and Explosives Index Page