Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF AUGUST 1,1996 PSA#1649

62nd Contracting Squadron, P.O. Box 4178, McChord AFB, WA 98438-0178

49 -- VEHICLE PARALLELOGRAM LIFT SOL F45603-96-R2002 DUE 091296 POC Les Larson, Contract Specialist, 206-984-3862 or Cliff Jackson, Contracting Officer, 206-984-3861. Furnish and install a complete lift assembly consisting of electro-hydrauliclift unit, a control console with hydraulic hoses, and runways with drive-up ramps. Each platform shall have a solid steel stop plate mounted on the front of the platform to prevent a vehicle from being driven off the front of the platform. Both platforms will have wheel chocks at the end of the platform. Chocks shall automatically swing into position as the lift is raised and automatically recede when the lift is lowered. Chocks will be securely pinned into the platform to prevent casual removal by shop personnel. Chock design shall provide for minimum of two inches of upward movement to prevent injury to personnel or damage to lift. Wheel chocks will not reduce the effective length of the platform by more than 6.3 inches. There shall be no fixed obstructions between the platform lifts. Dimensions are as follows: length - 52 feet, raised height - 6 feet 4 inches, retracted height is flush mounted with concrete floor, lifting capacity - 102,000 pounds, distance between platforms - 52 inches, platform width - 35 inches, and width of lift - 122 inches. The control system will lock-out operations of the lift controls if any unsafe condition exists due to insufficient air pressure to operate safety locks, displaced safety bars, or uneven platform heights. This lock-out shall not clear unless the unsafe condition has been corrected and the operator resets the control panel. The control system will identify lock-out conditions with visual signals. The main platform will have flouresent lights on the inner edges to illuminate the work area beneath the vehicle when it is raised on the lift. Lighting shall be installed in the recessed area oof the main lifting platforms to be protected by clear shatter proof tubes which will shield personnel in the event of bulb breakage. Manufacture will provide all operational training to personnel. All offerors must provide descriptive literature. All requests for a copy of the RFP must include business size standard and Commercial and Government Entity (CAGE) code. See Note 1. (0212)

Loren Data Corp. http://www.ld.com (SYN# 0421 19960731\49-0002.SOL)


49 - Maintenance Repair Shop Equipment Index Page