Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 26,1995 PSA#1333

U S ARMY ENGINEER DISTRICT, MOBILE, CONTRACTING DIVISION (CESAM-CT), (109 ST.JOSEPH ST. 36602) P.O. BOX 2288, MOBILE ALABAMA 36628-0001

Z -- REMOVE & REPLACE ELECTRICAL DISTRIBUTION SYSTEM FEEDER, MILLERS FERRY, AL POC Contact Mr. Earl Davis, 334/690-2535, Contracting Officer, Toni S. Carney (Site Code DODAAC) PRE-SOLICITATION NOTICE: Refer to Document No. DACW01-95-B-0080. Bid Opening Date is 13 June 1995. Remove and replace a 4160 volt feeder for an electrical distribution system. The project will require work in the Millers Ferry Powerhouse transformer yard as well as installing a new system. Electrical distribution feeds are to be removed and replaced between Millers Ferry Powerhouse and Millers Ferry Lock. Critical Path Method (Network Analysis System) is not required. Bid documents are available on or about 10 May 1995. Costs are as follows: Plans half size $5.00. Specifications $30.00. Estimated cost of work is between $250,000 and $500,000. Requests for Plans and Specifications shall indicate in writing whether firm will bid as a Prime Contractor or a Subcontractor. Unrestricted. All responsible sources may submit a bid which shall be(0114)

Loren Data Corp. http://www.ld.com (SYN# 0212 19950425\Z-0080.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page