SAMDAILY.US - ISSUE OF MARCH 06, 2026 SAM #8866
SOURCES SOUGHT

Z -- CONTROL SYSTEM UPGRADES AND REPLACEMENT WORK ON TADANO INFRASTRUCTURE SOLUTIONS CO., LTD. LAND PORTAL CRANES, LC47 AND LC48 AT BERTH 12 IN THE COMMANDER FLEET ACTIVITIES YOKOSUKA (CFAY), JAPAN

Notice Date
3/4/2026 8:26:16 PM
 
Notice Type
Sources Sought
 
NAICS
33324 —
 
Contracting Office
NAVFACSYSCOM FAR EAST FPO AP 96349-0013 USA
 
ZIP Code
96349-0013
 
Solicitation Number
N40084-26-R-0405
 
Response Due
4/5/2025 6:30:00 PM
 
Archive Date
04/21/2025
 
Point of Contact
Toshiki Hisasue, Phone: 0468164097
 
E-Mail Address
toshiki.hisasue.In@us.navy.mil
(toshiki.hisasue.In@us.navy.mil)
 
Description
The purpose of this procurement is to acquire control system upgrades and replacement work on land portal cranes, LC47 and LC48 at Berth 12. The upgrades and replacement work includes but is not limited to upgrading the cranes control systems. Upgrades and replacements include: � Procure and install replacement items and materials for various electrical equipment, inverters, programmable logic controllers (PLC) to include wiring connections to the replaced items, and computer software. Contractor shall be responsible for all applicable components and sub-components to maintain accordance with the late manufacturer�s standard � Inspection for all applicable components and sub-components for conditions, cleanliness, damage, defects, deterioration, corrosion, proper operating record to load/unload for applicable capacities, electrical connections, and the locations/positions correction as required, and verify the equipment location is free of debris and/or flammable material, during and/or end of the work scheduled daily and the completion of the work. Validation is required for the designated crane conditions and applicable capacities upon the receipt of task orders. Note: The Contractor shall record all operated works specifications and results, and submit it per SOW. Upon completion of above on-site works, put systems back to normal operation and check to ensure that equipment and systems are operating properly. Validate the operation/work entire area for the task order, and ensure all applicable power on/off device, on/off method, and positioned correctly before and after performing the work is the high priority for the Contractor protection in performance safety, and the site personnel/property safety.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/8027c518065f465cbe183d7ea721d522/view)
 
Place of Performance
Address: JPN
Country: JPN
 
Record
SN07734919-F 20260306/260304230049 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.