Z -- USP Marion - Upgrade Electrical - USP & SPC

Notice Date
2/26/2026 7:11:47 AM
 
Notice Type
Sources Sought
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
FAO GRAND PRAIRIE TX 75051 USA
 
ZIP Code
75051
 
Solicitation Number
15B40926PR000129
 
Response Due
3/13/2026 11:00:00 AM
 
Archive Date
03/28/2026
 
Point of Contact
Kevin Slone, Phone: 2025788617
 
E-Mail Address
kslone@bop.gov
(kslone@bop.gov)
 
Description
THIS IS A SOURCES SOUGHT NOTICE. THIS NOTICE IS ISSUED FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A SOLICITATION OR INVITATION FOR OFFERORS TO SUBMIT BIDS. A PRE-SOLICITATION SYNOPSIS OF PROPOSED CONTRACT ACTION WILL BE POSTED AT A LATER DATE THAT WILL PROVIDE INSTRUCTIONS FOR BIDDERS TO RESPOND TO THIS OPPORTUNITY. PLEASE DO NOT RESPOND TO THIS NOTICE IF YOU ARE NOT SERIOUSLY INTERESTED AND IF YOU DO NOT PERFORM THIS REQUIREMENT. IT WILL DELAY THE POSTING OF THE SOLICITATION DUE TO FURTHER MARKET RESEARCH THAT WILL BE REQUIRED. Interested small business contractors are requested to respond to this notice by filling out and emailing completed questionnaire attachment (see attached) to Kevin Slone at kslone@bop.gov. Responses must be received no later than March 13, 2026. Interested vendors must also add their names to the Interested Vendors List for this posting in https://sam.gov Contract Opportunity (must be logged-in to your account). The Federal Bureau of Prisons (FBOP) anticipates the need for a firm-fixed-price construction contract for a project entitled Update Electrical � USP & SPC, at the United States Penitentiary (USP) Marion, located in Marion, Illinois. USP Marion is federally owned facility located at 4500 Prison Rd, Marion, IL 62959. The project consists of the following: Existing unit substations in Vaults 1 through 5 will be replaced with new unit substation equipment mounted on new concrete pads on grade outdoors. Primary circuitry will be extended to feed each substation from existing vacuum loop switchgear, except for unit substation 4. All electrical equipment in Vault 4 will be demolished. New unit substation 4 will incorporate primary switchgear to replace the functionality of the Vault 4 loop switch. Existing panelboards in Vault 4 required to remain in service will be replaced with new panelboards in other locations. Existing primary loop fault indicators in Vault 4 will be salvaged, reinstalled and re-wired at the new substation. Structural repairs will be made to vault 4, all openings sealed, and the vault will be backfilled. The existing transformer and switchboard feeding the �Old Camp� will be demolished and replaced with new unit substation equipment mounted on a new concrete pad on grade outdoors. Existing primary cables will be spliced within the existing transformer �shack� and extended to the new substation. The existing primary circuitry serving the �Training Center� from the �Old Camp� transformer building will be spliced and re-fed from a switch incorporated in the new substation. Each new unit substation will incorporate metering at the low-voltage main breaker and each feeder breaker. Metering data will be communicated to the existing facility management system via new wiring. The facility management system will be configured to read, display, and record new metering data. Feeder circuits from each new Substation 1 through 6 to the immediate downstream panelboards will be replaced with new. Numerous deteriorated and under-rated panelboards served from substations 1 through 6 will be replaced with new panelboards. Boxes of flush-mounted panelboards will be extended to facilitate new conduit connections. Existing wiring will be spliced and extended as necessary. Panelboards not indicated for replacement will be upgraded with new dedicated equipment ground buses where they don�t exist. Branch circuit equipment grounds and neutrals will be re-terminated on their proper buses. The Contractor will be responsible to inspect the interior of each panelboard to determine which require new ground buses. Existing branch circuitry and wiring devices serving the penitentiary kitchen equipment, penitentiary laundry equipment, and �Old Camp� kitchen equipment will be replaced with new. Selected existing deteriorated motor starters in the Powerhouse will be replaced with new starters having similar functionality. See the Statement of Work/Specifications attachment for the complete requirements for the project. Access to the specifications and drawings attachments will require an active https://sam.gov vendor registration (log in). If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. Interested bidders must be registered in the System for Award Management (SAM) at https://sam.gov. The estimated magnitude of the project lies more than $10M. The estimated magnitude of the project lies more than $10M. (NOTE: This range is one of 8 available ranges and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.) The North American Industrial Classification System (NAICS) code applicable to this requirement is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a corresponding small business size standard of $19 million. To be considered an interested vendor, you must possess this NAICS code in your https://sam.gov registration. Interested bidders must be registered in https://sam.gov. The FBOP is seeking small business contractors for this project. Your business size metrics information entered in your https://sam.gov registration must be less than or equal to the small business size standard specified above (see provision 52.219-1 in the Representations & Certifications section of your https://sam.gov registration). Interested small business contractors are requested to respond to this notice by filling out and emailing completed questionnaire attachment to Kevin Slone at kslone@bop.gov. Responses must be received by March 13, 2026. Interested vendors must also add their name to the Interested Vendors List for this posting in https://sam.gov Contract Opportunity (must be logged-in to your vendor account).
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/5ca29210158a46b695251515a190f744/view)
 
Place of Performance
Address: Marion, IL 62959, USA
Zip Code: 62959
Country: USA
 
Record
SN07728934-F 20260228/260226230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.