Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 27, 2026 SAM #8859
SOLICITATION NOTICE

Y -- GAOA 4FO SMCG Trail Renovation

Notice Date
2/25/2026 7:02:09 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
HUMBOLDT-TOIYABE NATIONAL FOREST SPARKS NV 89431 USA
 
ZIP Code
89431
 
Solicitation Number
1240LT26Q0027
 
Response Due
3/31/2026 4:00:00 PM
 
Archive Date
04/15/2026
 
Point of Contact
Derrick Dodson, Coby Cubic
 
E-Mail Address
derrick.dodson@usda.gov, coby.cubic@usda.gov
(derrick.dodson@usda.gov, coby.cubic@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36� cmp. Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite. Aggregate base shall be 4� depth below asphalt. Asphalt trail shall have 6� width, 3� depth and 2% cross slope (max). Aggregate base, asphalt and concrete testing per FP-24. Resting pads shall be asphalt with 4� width, 6� length, 3� depth and 2% cross slope (max) in all directions. Resting pads aggregate base shall be compacted with water. Concrete curb shall be NDOT Type 5. Spillway to culvert inlet is inclusive to curb. Concrete curb may be placed on compacted aggregate base. Native subbase shall be compacted with water. The grade will be inspected for soft spots and accepted before concrete placement. Backfill to top of curb with native material. Corrugated metal pipe item includes submitting a proposed pipe plot for placement of 36� culvert. Design for minimum 5% drop. Removal of existing culvert, inlet stacked rock and outlet riprap are inclusive to new culvert placement. All work to extend asphalt trail and shoulders is inclusive to the option items
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/1212ca9c2d924ccda86e49d3dfada66a/view)
 
Place of Performance
Address: NV, USA
Country: USA
 
Record
SN07726678-F 20260227/260225230041 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.