Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 26, 2026 SAM #8858
SOLICITATION NOTICE

J -- J--ANNUAL CRANE INSPECTIONS

Notice Date
2/24/2026 8:44:38 AM
 
Notice Type
Solicitation
 
NAICS
811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
 
Contracting Office
MP-REGIONAL OFFICE SACRAMENTO CA 95825 USA
 
ZIP Code
95825
 
Solicitation Number
140R2026Q0019
 
Response Due
2/27/2026 10:00:00 AM
 
Archive Date
03/14/2026
 
Point of Contact
Anaya, Sarah, Phone: 9169785140, Fax: 916-978-5175
 
E-Mail Address
sanaya@usbr.gov
(sanaya@usbr.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The purpose of this amendment is to include thoughtful questions and answers being asked by industry and make them available to the public. Please see the below questions and answers with associated/attached documents below: 1. Inspection Frequency � Are all listed crane assets strictly annual inspections, or do any require semi-annual or additional inspections during the performance period? See attached Crane inspection policy for Northern California Area Office. Also see attached proposed schedule for crane inspections in 2026. We need to stagger the inspections to align with our maintenance and frequent inspection schedule We perform the following inspections Daily: Every time crane is used. This is done by Crane Operator (Plant Mech) Frequent: Every 6 months. This aligns with our yearly Preventive Maintenance done on Crane. This is done by inhouse Plant Mech Annual Inspection: This includes the same inspections done per frequent inspections plus any other standard inspections the third-party inspector normally performs. This work is done by Third Party crane inspection. The BOR will provide a Plant Mech to support third party crane inspector. The plant mech can operate the crane as needed for the inspector. 2. Access / Lift Requirements � For cranes requiring elevated access, will the Government provide lifts or scaffolding, or should the contractor include lift equipment and associated costs in their pricing? The contractor is required to provide Lifts as needed to perform the necessary annual third-party crane inspections. This is called out in section 2.02 WORK TO BE PERFORMED A. Contractor shall provide all labor, tools, special tools, man lifts, safety equipment and consumable materials including cleaning products, spray lubricants. and grease as required to complete the work. 3. SMC Mobile Crane Scope � Please confirm the scope and inspection frequency for the SMC Mobile Crane and whether it follows the same annual schedule as the fixed crane assets. Yes same inspection requirements. One third party inspection per year 4. Facility Locations � Could you please provide the full physical addresses (or confirmed locations) for each listed facility to ensure accurate travel and mobilization pricing? See attached spreadsheet with addresses
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/f8896e06743a4230876f2f97e84faa84/view)
 
Place of Performance
Address: Northern California Area Office (NCAO) 16349 Shasta Dam Boulevard, Shasta Lake, CA 96019, USA
Zip Code: 96019
Country: USA
 
Record
SN07725062-F 20260226/260224230037 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.