Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 20, 2025 SAM #8607
SOLICITATION NOTICE

95 -- Aluminum Material for Bulkhead/Sluicegate Fabrication

Notice Date
6/18/2025 5:53:13 AM
 
Notice Type
Solicitation
 
NAICS
331313 — Alumina Refining and Primary Aluminum Production
 
Contracting Office
W07V ENDIST ST PAUL SAINT PAUL MN 55101-1323 USA
 
ZIP Code
55101-1323
 
Solicitation Number
W912ES25Q0060
 
Response Due
6/26/2025 1:00:00 PM
 
Archive Date
07/10/2025
 
Point of Contact
Benjamin Knutson, Phone: 651-290-5418, Sharon FRANK-SCHEIERL, Phone: 651-290-0518
 
E-Mail Address
benjamin.t.knutson@usace.army.mil, sharon.m.frank-scheierl@usace.army.mil
(benjamin.t.knutson@usace.army.mil, sharon.m.frank-scheierl@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
SCOPE OF WORK Aluminum Material for Bulkhead/Sluicegate Fabrication at Lock and Dam 7U.S. Army Corps of Engineers, St. Paul District 1.General Description. The Contractor shall provide various shapes/quantities of aluminum material for the fabrication of a spillway sluicegate. This includes delivery to US Army Corps of Engineers Service Base in Fountain City, WI and Pleasant Valley, IA. 2. Aluminum Specifications. A. Must conform to Buy American Act. B. Must conform to ASTM B209/B209M and ASTM B308/B308M Alloy 6061, Temper T6C. Final product shall be clean and free of any oil or grease, dross, slag or burrs. D. All cut edges (regardless of method) shall have a surface roughness acceptable for welding.E. Final product shall be legibly marked with the applicable designation, grade, heat number, size and thickness, name brand, or trademark of the manufacturer for identification and shipment.F. Bundle and band the material required for shipping, with cribbing at minimum six inches above the base of the shipping platform to allow offloading with a forklift and/or crane. Covering of the material during shipment is not required.3. Sizes, Shapes: See SolicitationShipping Locations: See Solicitation. 4. Submittals The Contractor shall submit a verifiable mill certification electronically in pdf format via email to both the Government Contracting Officer?s representative and the Government technical point of contact prior to shipment of the material. The Government technical point of contact is: Available at the award.5. Delivery Location, Schedule, and POCs: Delivery shall be no later than July 31st, 2025. The soonest possible delivery is requested if possible. All material shall be delivered to the following addresses during business hours of 07:00 to 15:00, Monday through Thursday, excluding federal holidays. Please give the POC listed below 24 hours advance notice. The delivery location for each material is listed in section 3 of this statement of work. Delivery Location Address and POCs for each are as follows:US Army Corps of Engineers MRPO-Service Base25549 182nd St.Pleasant Valley, IA, 52767andUS Army Corps of EngineersMRPO Service Base431 Northshore DriveFountain City, WI 54629
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d5be823e282b41b0ae671303d41d6908/view)
 
Place of Performance
Address: US Army Corps of Engineers MRPO-Service Base25549, 182nd St Pleasant Valley, IA, 52767 and US Army Corps of Engineers MRPO Service Base431 Northshore Drive Fountain City, WI 54629 52767
Zip Code: 52767
 
Record
SN07483193-F 20250620/250618230338 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.