SOLICITATION NOTICE

Y -- Y--Yellowtail Switchyard DCS Phase I Pre-Fabricated Building and Construction

Notice Date
5/29/2025 1:39:47 PM
 
Notice Type
Presolicitation
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
WESTERN-ROCKY MOUNTAIN REGION LOVELAND CO 80538 USA
 
ZIP Code
80538
 
Solicitation Number
89503225BWA000069
 
Response Due
7/25/2025 1:00:00 PM
 
Archive Date
08/30/2025
 
Point of Contact
Pratt, John W., Phone: 720-962-7166
 
E-Mail Address
jpratt@wapa.gov
(jpratt@wapa.gov)
 
Description
NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted. The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. Yellowtail Switchyard DCS Phase I priniciple components of work include demolishing of existing building, providing a new pre-fabricated building, complying with all applicable safety requirements contained in WAPA's Construction Standard 1 and OSHA Standards, replacing five (5) 230-kV power circuit breakers including their concrete foundations, rotating six (6) 115-kV power circuit breakers 180 degrees, replacing four (4) 115-kV power circuit breaker concrete foundations, removing six (6) pothead steel structures, removing two (2) disconnect switches (steel only), removing eighteen (18) bus poles and their foundations, removing two (2) lighting units and their foundations, removing two (2) disconnect switches and their foundations, removing one (1) 230-kV power circuit breaker and its foundation, removing two (2) single platforms, removing one (1) double platform, installing one (1) bus pole and its foundation, replacing twelve (12) 230-kV disconnecting switches, replacing two (2) 230-kV disconnecting switches with ground blades, installing one (1) 230-kV CCVT and its foundation, installing a prefabricated control building and associated equipment, material and foundations.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/4e9dc38204af4180b8ff1fba7272aca9/view)
 
Record
SN07459519-F 20250531/250529230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.