Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 18, 2025 SAM #8574
SOLICITATION NOTICE

46 -- Critical Water System St. Cloud VAMC

Notice Date
5/16/2025 8:30:11 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
221310 — Water Supply and Irrigation Systems
 
Contracting Office
NETWORK CONTRACT OFFICE 23 (36C263) Saint Paul MN 55101 USA
 
ZIP Code
55101
 
Solicitation Number
36C26325Q0774
 
Response Due
5/27/2025 8:00:00 AM
 
Archive Date
06/11/2025
 
Point of Contact
Becky De Los Santos
 
E-Mail Address
becky.delossantos@va.gov
(becky.delossantos@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Description
Mod 1 to Solicitation 36C26325Q0774 Questions are Due: 5/23/2025 @1000 CST. to Becky.delossantos@va.gov St. Cloud VA, 4801 Veterans Drive, St. Cloud MN, 56303 has a requirement for a Critical Water System that meets all requirements of AAMI ST108. The system must be in the configuration of a reverse osmosis (RO) system that includes a deionization process and a UV Sterilized recirculation loop. The recirculation loop will be installed by a separate contract. It will be 1.5 inches in diameter, schedule 80 PVC with a total loop length of approximately 250 feet. The contractor and critical water system must meet the following: Must have extensive knowledge of AAMI ST108 application. Companies supplying equipment must have a minimum of 5 years of experience installing and servicing critical water systems for healthcare. Must be a vendor of both EDI (Electronic Deionized Systems) and Type 1 mixed bed DI tanks for backup. System must include Electronic DI of up to 3 gallons per minute. Minimum system production rate of 3 gallons per minute. Minimum storage tank volume of 250 gallons. Minimum peak delivery rate of distribution loop shall be 40 gallons per minute. Variable frequency drive (VFD) to regulate distribution pump. UV sterilization capable of handling 30 gallons per minute. 5 filter endotoxin filtration system. Anti-scale chemical feed pretreatment tanks to allow for pH adjustments. The system offered by the contractor must, at a minimum, deliver critical water with the following qualities: Water quality greater than 0.1 megohm, but less than 0.5 megohm pH between 5.0 and 7.5 Total Alkalinity - < 8 mg CaCO2/L Total Hardness - < 1 mg CaCO2/L Conductivity - < 10 �S/cm Chlorides - < 1 mg/L Bacteria - < 10 CFU/mL Endotoxin - < 10 EU/mL Total Organic Carbon - < 1.0 mg/L Manganese - < 0.1 mg/L Copper - < 0.1 mg/L Iron - < 0.1 mg/L Aluminum - < 0.1 mg/L Nitrate < 1 mg/L Phosphate < 1 mg/L Sulfate < 1 mg/L Silicate < 1 mg/L Zinc < 0.1 mg/L The system shall also include an in-line conductivity monitor with the minimum following characteristics: Four monitoring ranges LCD wall-mounted display and controls Ability to display water temperature Adjustable high and low setpoints Local visual light on the display to indicate when water is outside setpoints Local audible alarm to indicate when water is outside setpoints Set of dry contacts to allow connection to BAS for remote alarms Programmable alarm delay time 120V AC power cord Space and Utility Requirements The Critical water system must be installed into a closet that is 16�8� wide x 4�2� deep. Two sets of double doors will provide access to this space. Each set of doors measures 6�0� wide and 7�0� tall. The Owner will provide the following utilities to support the critical water system : �� domestic softened water supply, tempered to 72-76 degrees Fahrenheit. Floor sink in the back right corner of the closet. Dedicated 480V, 3 phase, 15 amp circuit, disconnect and hard-wired whip connection to VFD for distribution pump. Dedicated 208V, 1 phase, 20 amp circuit and NEMA 6-20 receptacle for electronic DI. Dedicated 120V, 1 phase, 20 amp circuit and receptacle for RO system. 120V, 1 phase convenience receptacles for monitoring systems. INSTALLATION Contractor shall furnish all necessary labor, tools, equipment, and transportation necessary to install critical water treatment system in the space described above. Contractor is responsible to assemble, install, start-up and sanitize the new RO system. Upon award, Contractor shall coordinate with the Post-award POC for this project to establish work schedule within the contract Period of Performance and coordinate security badging for contractor personnel who will work on site to perform the installation. The contractor�s personnel, while on VA property, shall adhere to all requirements and regulations that govern the VA Health Care System and its property. St. Cloud VA Contractor badge shall be worn by all Contractor employees while working on VA premises. Installation shall be performed during normal business hours Monday through Friday 8:00 am to 4:30 pm, excluding Federal Holidays, unless otherwise authorized by the VA POC. Contractor shall adhere to the VHA tobacco-free campus policy. PLACE OF PERFORMANCE St. Cloud VA Medical Center 4801 Veterans Drive St. Cloud, MN 56303-2015 PERIOD OF PERFORMANCE INSTALLATION: 07/15/2025 TO 09/15/2025
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/f090dbb3ce704449b7972d441b4580fd/view)
 
Place of Performance
Address: Saint Cloud, MN 56303, USA
Zip Code: 56303
Country: USA
 
Record
SN07446259-F 20250518/250516230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.