Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 09, 2025 SAM #8535
SOURCES SOUGHT

Y -- Kansas City Levees Closure Structures Across Railroad Tracks

Notice Date
4/7/2025 8:24:39 AM
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST KANSAS CITY KANSAS CITY MO 64106-2896 USA
 
ZIP Code
64106-2896
 
Solicitation Number
W912DQ25RA042
 
Response Due
5/5/2025 9:00:00 AM
 
Archive Date
05/26/2025
 
Point of Contact
Myleesa France, Phone: 8163893805, David Walsh, Phone: 816-389-3352
 
E-Mail Address
myleesa.s.france@usace.army.mil, david.j.walsh@usace.army.mil
(myleesa.s.france@usace.army.mil, david.j.walsh@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)-owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units. The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202.Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees. Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages. Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track.Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/5fbca5df54ee45448853ee0e2158f37d/view)
 
Record
SN07400206-F 20250409/250407230055 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.