Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 27, 2025 SAM #8493
SOLICITATION NOTICE

20 -- ALDER REFER REPAIR

Notice Date
2/25/2025 1:45:17 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z085Q250011384
 
Response Due
3/5/2025 8:00:00 AM
 
Archive Date
03/05/2025
 
Point of Contact
DONNA O'NEAL, Phone: 5103931145, GEORGE, JERAMYAH, Phone: 5104375436
 
E-Mail Address
Donna.J.O'Neal@uscg.mil, JERAMYAH.W.GEORGE@USCG.MIL
(Donna.J.O'Neal@uscg.mil, JERAMYAH.W.GEORGE@USCG.MIL)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Statement of Work Guide 1. Purpose and Scope CGC ALDER�s reach in reefer units are plagued with multiple different issues outside of SF and NED capabilities. Civilian KTR shall conduct repairs to each reefer unit, rectify all issues, and return to OEM spec. Civilian KTR shall provide all required parts, tools, and consumables to repair the three systems listed below to restore them to full functionality including condenser/evaporator components, defrost/timers, thermostatic control components, and fully charge all systems insure they are free of leaks. 2. Deliverables and Performance Requirements � Civilian KTR shall provide all required parts, tools, and consumables to repair the three systems listed below to restore them to full functionality including condenser/evaporator components, defrost/timers, thermostatic control components, and fully charge all systems insure they are free of leaks. KTR shall procure and dispose of all hazardous materials IAW all federal, state, and local laws/requirements. � Galley reach in freezer: Evaporator coil ices up coil heater is in-op and defrost timer does not cut in or out heater, condensing unit runs non-stop and icing up evaporator coil. � Salad Bar Reach in Cooler: Unit works and drops temperature to thermowell and reach but runs too long and over cools thermowell and refrigerator. � Wardroom Cooler and Freezer: Unit freezer and fridge work in reverse when operating for short time. Unit fans run separately not allowing proper air flow over evaporator. System performance is unreliable due to suspected refrigerant leaks. 3. Period of Performance Completion before 1JUN2025 4. Location and Method of Performance USCGC ALDER (WLB 216) Coast Guard Sector San Francisco 1 Yerba Buena Island San Francisco, CA 94130 5. Roles and Responsibilities Contractor shall provide all equipment described in paragraph 2. Contractor shall provide a qualified technician for all contractor equipment. Ship will provide qualified personnel to assist as needed for the operation of ship installed equipment. 6. Acceptance Criteria N/A 7. Security and Confidentiality Ship POC will escort contractor and contractor vehicle from base access to the ship. Contractor shall notify ship POC upon arrival. 8. Reporting Requirements KTR shall provide invoice/trip report within one week of completion of contracted work. 9. Legal Compliance N/A 10. Performance Monitoring Contractor will comply with all regulations described in paragraph 2. Additional Considerations Personal must be certified to service installed refrigerant systems/equipment. THIS IS TO BE AWARDED BASED OF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PERFORMANCE.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/73102017c8034605ae0b564fdcdb1010/view)
 
Place of Performance
Address: San Francisco, CA 94130, USA
Zip Code: 94130
Country: USA
 
Record
SN07352886-F 20250227/250225230036 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.