SOLICITATION NOTICE
59 -- ANTENNA ASSEMBLY
- Notice Date
- 2/12/2025 3:40:16 AM
- Notice Type
- Solicitation
- NAICS
- 334220
— Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N0038325QS113
- Response Due
- 3/14/2025 1:30:00 PM
- Archive Date
- 03/29/2025
- Point of Contact
- Telephone: 2156972606
- E-Mail Address
-
SARAH.MARIANO@NAVY.MIL
(SARAH.MARIANO@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N763.11|WRA|215-697-4363|sarah.l.mariano2.civ@us.navy.mil | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|Source/source|TBD|N00383|TBD|TBD|See schedule|TBD|||TBD|||||| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|334220|1,250||||||||||| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under theterms of the contract. For purposes of this section, Return is defined asphysical receipt of the F-condition asset at the contractor?s facility asreflected in the Action Date entry in the Commercial Asset Visibility(CAV) system. In accordance with the CAV Statement of Work, thecontractor is required to accurately report all transactions by the end of thefifth regular business day after receipt and the Action Date entered inCAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent Contract. Required RTAT: 119 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint foreach NSN(s). Total assets to be repaired monthly after initial deliverycommences X month (contractor fill in #). A throughput of 000 per monthreflects no throughput constraint. Induction Expiration Date: 365 days aftercontract award date. Any asset received after this date in days is notauthorized for repair without bi-lateral agreement between the Contractor andNAVSUP WSS Contracting officer. Reconciliation: A reconciliation modification will be issued after finalInspection and acceptance of all assets inducted under the subsequent contractThe parties have agreed to a price (shown on the schedule page) foreach unitat the negotiated RTAT. Such prices are based on the Contractor meeting theRTAT requirements. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS,DELIVERY ORDERS AND MODIFICATIONS)RELATED TO THE INSTANT PROCUREMENT ARECONSIDERED TO BE ""ISSUED"" BY THE GOVERNMENT WHEN COPIES AREEITHER DEPOSITED INTHE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCEMETHODS, SUCH AS EMAIL. THE GOVERNMENT?S ACCEPTANCE OF THE CONTRACTOR?SPROPOSAL CONSTITUTES BILATERAL AGREEMENT TO ""ISSUE"" CONTRACTUAL DOCUMENTS ASDETAILED HEREIN. \
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/65879c4e800d49e4960c9145236a192d/view)
- Record
- SN07341082-F 20250214/250212230036 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |