Z -- Jefferson Barracks St Louis Completion Contract

Notice Date
2/12/2025 8:13:25 AM
 
Notice Type
Solicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) WASHINGTON DC 20001 USA
 
ZIP Code
20001
 
Solicitation Number
36C10F24R0098
 
Response Due
3/14/2025 8:00:00 AM
 
Archive Date
04/13/2025
 
Point of Contact
Gary L Fowler, Contract Specialist
 
E-Mail Address
gary.fowler@va.gov
(gary.fowler@va.gov)
 
Awardee
null
 
Description
SCHEDULE OF CONTRACT LINE ITEMS AND PRICES/COSTS STL JV VAMC Completion List Project In accordance with the Request For Proposal, the contract drawings and specifications and amendments to either, the work of each Contract Line Item as defined herein in general terms includes, but is not limited to, provision of all labor, materials, tools, equipment, transportation, management, supervision, quality control and all other necessary services and performance of all construction services and incidental related work for completion of fully functional, integrated and operational site improvements. Item No. 1: Add electrical power to steam manholes 4, 5, and 6 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 1: $ __________________________ Item No. 2: Reconnect/Replace Ballard lights at Fisher House. Investigate the lighting circuits and restore the operation of the exterior bollard lights using new 36 inch tall light bollard and new concrete bases where the existing bollard are located around the Fisher House. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 2: $ __________________________ Item No. 3: Replace water supply to Fisher House GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 3: $ __________________________ Item No. 4: Reconnect/Replace Ballard lights at Fisher House GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 4: $ __________________________ Item No. 5: Replace watermain dead leg southeast of Building 1 and Item No. 10: Change the direction of the fire hydrant east of the Building 53 loading dock GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 5 & 10: $ __________________________ Item No. 6: Add toe rail on all handrail south of Building 1 and add new handrail and toe rail north of Building 56 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 6: $ __________________________ Item No. 7: Replace east sidewalk south of Building 1 that does not meet VA standards for slope GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 7: $ __________________________ Item No. 8: Replace curb islands on either side of the handicap parking spaces south of Building 1 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 8: $ __________________________ Item No. 9: Repair/regrade asphalt around water main valve GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 9: $ __________________________ Item No. 10: See Item No. 5 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 10: $ __SEE Item No. 5___________ Item No. 11: Clean under grate and clean silt out of high voltage electrical manhole GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 11: $ _________________________ Item No. 12: Add photocell pedestal controller for B54 exterior lights GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 12: $ _________________________ Item No. 13: Enlarge mulch area or install new mulch area around light fixtures in the west campus areas GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 13: $ _________________________ Item No. 14: Install new metal edging, removed existing sod, and install new mulch around flag pole bases and their inground light bases GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 14: $ _________________________ Item No. 15: Mill and overlay asphalt pavement approximately 660 LF and selectively replace deteriorated concrete curb and gutter in this location GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 15: $ _________________________ Item No. 16: Remove two large trees in the west campus area north of the north entrance road GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 16: $ _________________________ Item No. 17: Add photocell controller to the west campus area exterior lighting GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 17: $ _________________________ Item No. 18: Provide 100 customizable memorial pavers in the existing memorial band of pavers in the west campus area GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 18: $ _________________________ Item No. 19: Remove vegetation existing aggregate base and install new anti-vegetation mat and aggregate base at the top of the cast-in-place retaining wall GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 19: $ _________________________ Item No. 20: Replace existing underground steam line and condensate lines under the asphalt at the Building 24 loading dock GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 20: $ _________________________ Item No. 21: Excavate steam pipe thrust block on new steam manhole 5 and steam manhole 6, take compaction and soil bearing measurements, backfill and restore excavated areas GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 21: $ _________________________ Item No. 22: Construct access roadway/walkway path to existing steam manhole at the southeast corner of Building 57 GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 22: $ _________________________ Item No. 23: Not Used GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 23: $ ____Note Used ____________ Item No. 24: Install new detector loops and new conduits and restore operations to the Building 57 vehicle double gates GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 24: $ _________________________ Item No. 25: Not Used GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 25: $ ____Not Used _____________ Item No. 26: Inside the mechanical room remove silt from the pipe chase pit, reseal the two steam pipe wall penetrations from the inside, replace the steam pit floor drain cover, excavate the stem pipe wall penetrations from outside building 52 and re-seal the penetration from the outside, backfill and restore the excavation area. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 26: $ _________________________ Item No. 27: Add galvanized steel support brackets in the new steam manholes under each end of the center lid support beam. Repair concrete where cracked around the lid center beam connect points. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 27: $ _________________________ Item No. 28: Replace chilled water pipes in chilled water pipe manhole No. 25 which is north of Building 23. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 28: $ _________________________ Item No. 29: Demolish the top of three existing and abandoned steam manholes to 24 inches below existing finish grade, abate and remove the steam pipes in the manholes to 1 ft. inside the connecting underground pipe chases, fill the openings with CMU block walls, fill the now empty manhole with clean aggregate from the bottom of the manhole to 24 inches below finish grade to prevent future settlement, backfill on top of the clean aggregate with clean dirt to 4 inches below subgrade, backfill with 4 inches of tope soil and install sod at finish grade. One manhole will receive an aggregate base in lieu of sod and top soil where it sets in an existing aggregate parking area. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 29: $ _________________________ Item No. 30: Re-install 40 LF of ornamental railing in the west campus area to correct an alignment. The ornamental rail will be cut apart as needed raise 2=approximately 2.5 inches and rewelded and repainted, restored to its existing finish. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 30: $ _________________________ Item No. 31: Replace concrete pavement around light pole at the southeast corner of Building 25. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 31: $ _________________________ Item No. 32: Remove silt from old steam manhole No. 3 at the southeast corner of Building 75 and add block enclosures inside the manhole to prevent silt from entering the manhole from the connecting underground pipe chases. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 32: $ _________________________ Item No. 33: Replace the inground light fixture at monument area with matching light fixture flush with the adjacent exposed aggregate finish. A deviation in elevation of greater than 1/8 inch will not be acceptable for the top of the new inground light fixture. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 33: $ _________________________ Item No. 34: Move electrical panels that are currently inside the chilled water manhole side of manholes 13, and inside steam manhole 15 from the underground manhole vault to a new exterior electrical panel on a new exterior concrete slab. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 34: $ _________________________ Item No. 35: Remove two existing un-sued light pole bases on the west side of building 52. Remove the concrete base to a depth of 18 inches below grade and restore the excavated area with clean dirt, topsoil and seed and straw. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 35: $ _________________________ Item No. 36: Repair the damaged EIFS spots along the south side of Building 1 and repaint the repaired spots. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 36: $ _________________________ Item No. 37: Not Used GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 37: $ _____Not Used____________ Item No. 38: Remove the existing wall coating in the rehab pool and connecting hallway in Building 54 and install a new spray in textured wall coating. Dye the wall coating to patch the existing conditions minus the stripe design. GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details. Item No. 38: $ _________________________ Grand Total: $_________________________
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/7b60075769db4cfa9de794ef42c0b767/view)
 
Record
SN07340758-F 20250214/250212230034 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.