Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 09, 2019 FBO #6558
MODIFICATION

Y -- CO FTNP ROMO 11(4) Beaver Meadows Road - Amendment 1

Notice Date
11/7/2019
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF19B000022
 
Response Due
12/2/2019 2:00:00 PM
 
Point of Contact
Leslie N. Karsten, , Sheri Walsh,
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Amendment A001 THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS. THIS IS REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT NUMBER: CO FTNP ROMO 11(4) PROJECT NAME: Beaver Meadows Road PROJECT DESCRIPTION: This project provides 3R rehabilitation treatment for routes to include 4.85 miles of Beaver Meadows roadway within Rocky Mountain National Park. The project will also be lengthening and adding a FAST lane at Beaver Meadows Entrance Station which is approximately 1,400 feet. The project consists of pulverizing the existing asphalt for additional base, concrete curb, drainage improvements, and repaving with approximately 4” of asphalt. The project will grade side slopes due to additional pavement thickness along shoulders. Pullouts directly adjacent to the roadway will also be treated and repaved as part of the project. SIGNIFICANT QUANTITIES: Significant Items for Schedule A include: 250 LNFT of Standard Underdrain, 1.8 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 10,750 TONS of Hot Asphalt Concrete Paving, 2,550 LNFT of 14-Inch Colored Concrete Curb and Gutter, 1,200 CUYD of Roadway Excavation, and 100 CUYD of Subexcavation. Significant Items for Option W include: 0.5 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 4,350 TONS of Hot Asphalt Concrete Paving, 3,050 LNFT of 12-Inch Colored Concrete Curb and Gutter, 1,500 LNFT of 14-Inch Colored Concrete Curb and Gutter, 1,500 CUYD of Roadway Excavation, and 400 CUYD of Subexcavation. Significant Items for Option X include: 0.9 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 5,200 TONS of Hot Asphalt Concrete Paving, 270 LNFT of 14-Inch Mountable Colored Concrete Curb and Gutter, 1,200 LNFT of 14-Inch Colored Concrete Curb and Gutter, 100 CUYD of Roadway Excavation, and 100 CUYD of Subexcavation. Significant Items for Option Y include: 120 LNFT of Curb and Gutter Removal and Installation, 650 SQYD of Asphalt Patch, and 160 LNFT of Standard Underdrain. COST RANGE: Estimated total cost for Schedule A, Option W, Option X, and Option Y is $5,000,000 to $7,000,000. CONSTRUCTION DURATION : May, 2020 through October, 2020. ADDITIONAL INFORMATION: Anticipated Bid Opening: December 10, 2019 Anticipated Award: January 6, 2019
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF19B000022/listing.html)
 
Place of Performance
Address: Rocky Mountain National Park, Colorado, United States
 
Record
SN05492453-W 20191109/191107231023-8f19c7e058770d1c5e29b87d7eb7c67c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.