Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 10, 2018 FBO #5923
SOLICITATION NOTICE

Z -- Bird Creek Campground Renovation Project

Notice Date
2/8/2018
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise, Idaho, 83709, United States
 
ZIP Code
83709
 
Solicitation Number
12026118R0004
 
Archive Date
5/8/2018
 
Point of Contact
Tanya Spanfellner, Phone: 2083734130
 
E-Mail Address
tspanfellner@fs.fed.us
(tspanfellner@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
THIS PROJECT WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS. BIRD CREEK CAMPGROUND RENOVATION PROJECT-HUMBOLDT-TOIYABE NATIONAL FOREST This project includes the renovation of the Bird Creek Campground on the Ely Ranger District on the Humboldt - Toiyabe National Forest. The work includes: 1.Removal and disposal of existing structures and site furnishings. 2.Obliterating, scarifying, and re-contouring existing roads and paths. 3.Reconstruction of campground roads, pullouts, parking areas, back-in spurs and pull-through spur. 4.Installing new culverts and signs for roadways. 5.Installing new portions of an existing water system including a new pump control building, electrical tie-in, distribution lines, hydrants, and valve boxes. 6.Installing government furnished restrooms with aggregate pathways. 7.Constructing new horseshoe pits. 8.Constructing a new aggregate pathways. 9.Constructing new footbridges on pathways. 10.Installing new site features, including site wheelstops, kiosk, unit markers, and government-furnished fee tube. 11.Constructing new concrete group site with fire pit and site furniture. 12.Construction of new aggregate surface family units with site furniture and aggregate paths. Government Furnished Items: 13.Vault Toilet Buildings (2 each) 14.Fee Tube PROJECT LOCATION The project is located in the Ely Ranger District of the Humboldt-Toiyabe National Forest, White Pine County, NV, in Section 34, T 19 N, R 65 E. It is located approximately 24 miles northeast of Ely, NV. The project may be accessed from US Highway 93, Duck Creek Road, and Forest Road 426 (Bird Creek Road). Estimated price range between $500,000 and $1,000,000. Estimated Start Date: June 1, 2018, contract time 120 Calendars Days. NAICS: 237990, $36.5M
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/12026118R0004/listing.html)
 
Place of Performance
Address: Ely Ranger District-White Pine County, NV, in Section 34, T 19 N, R 65 E. It is located approximately 24 miles northeast of Ely, NV. The project may be accessed from US Highway 93, Duck Creek Road, and Forest Road 426 (Bird Creek Road)., Ely, Nevada, 89301, United States
Zip Code: 89301
 
Record
SN04816674-W 20180210/180208231224-43605cd9acb08b6fcc04434c00255806 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.