Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 22, 2017 FBO #5629
SOLICITATION NOTICE

T -- Interpretive Panel and Exhibit Services

Notice Date
4/20/2017
 
Notice Type
Presolicitation
 
NAICS
339999 — All Other Miscellaneous Manufacturing
 
Contracting Office
FWS, DIVISION OF CONTRACTING AND GE LAKE PLAZA NORTH 134 UNION BOULEVARD Lakewood CO 80228-1807
 
ZIP Code
80228-1807
 
Solicitation Number
F17PS00241
 
Response Due
5/22/2017
 
Archive Date
6/6/2017
 
Point of Contact
Deberry, Cathleen
 
Small Business Set-Aside
Total Small Business
 
Description
U.S. Fish and Wildlife Service, Region 6 National Wildlife Refuge System Interpretive Panel and Exhibit Services The Contractor shall furnish all labor, transportation, equipment, services, facilities, and materials needed to properly design, fabricate, and install interpretive panels, exhibits, and related framing/mounting systems. a. The Contractor shall coordinate with the Project Lead (for a specific task order) to maintain quality workmanship; create a project timeline; acquire reference materials; get approval at the appropriate stages of interpretive panel and exhibit design, fabrication, and installation; coordinate schedules; and complete other aspects of the project work. b. The Contractor shall conduct the necessary research for all design, fabrication, and installation services. c. The Contractor shall employ the latest and most suitable technology in the design, fabrication, and installation of all interpretive panels, exhibits, and related framing/mounting systems. i. The interpretive panels, exhibits, and diorama mounting systems should match and/or complement each other. ii. If current exhibits exist on-site, new exhibits should match and/or complement the existing interpretive panels and exhibits. d. For interpretive panel projects, the Contractor shall complete on-site installation of the framing/mounting system, provide framing/mounting systems in kit form with instructions for assembly by Service staff, or provide instructions for installation by Service staff. Each Task Order Project Description will specify if installation will be required by the Contractor or performed by Service staff. e. All exhibits will combine both two- and three-dimensional components to enhance the sequence of viewing the various exhibit elements without interrupting visitor flow and movement in the area. f. For exhibit projects, the Contractor shall complete on-site installation of the exhibits in most instances. In some cases, the Contractor shall provide exhibits in kit form with instructions for assembly by Service staff. Each Task Order Project Description will specify if installation will be required by the Contractor or performed by Service staff.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/FWS/CGSWO/F17PS00241/listing.html)
 
Record
SN04479158-W 20170422/170420234819-b15510deacfed5c6fe8a800e662b3193 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.