Y -- F-35 Aircraft Maintenance Hangar and Flightline Apron Expansion at Marine Corps Air Station (MCAS) Miramar, in San Diego, California - Attachment

Notice Date
12/16/2016
 
Notice Type
Attachment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N62473 NAVFAC SOUTHWEST, CENTRAL IPT CODE ROPCA 1220 Pacific Highway San Diego, CA
 
Solicitation Number
N6247317S3404
 
Response Due
1/5/2017
 
Archive Date
1/20/2017
 
Point of Contact
ROY LAYUG 6195324371
 
E-Mail Address
NAVFAC SW Contract Specialist
(roy.layug@navy.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment 02 Dated December 16, 2016 Sources Sought Number: N6247317S3404 The purpose of Amendment 02 is: 1.To answer RFI questions 1 and 2. 2.To REMOVE and REPLACE the EXPERIENCE factor as follows: REMOVE: 4) Experience: Submit a minimum of three and maximum of five Government or commercial new construction contracts/projects your firm has substantially completed in the last five (5) years, as a prime contractor, that best demonstrate your experience on projects that are similar in size, scope, and complexity to this requirement. Experience must be demonstrated in construction of new aircraft maintenance hangars or similar facility, SAPF spaces, and Portland cement concrete airfield pavement for heavy winged aircraft. All hangar projects must have a minimum construction cost of $50,000,000 and all airfield pavement projects must have a minimum size of 500,000 square feet. All projects must involve new construction of facilities; repair projects will not be considered. For each of the contracts/projects submitted for experience, provide the title, location, whether prime or subcontractor work, award and completion dates, contract or subcontract final cost, type of work, type of contract, a narrative description of the product/services provided by your firm, and customer information including point of contact, phone number and email address. Recent is defined as having been completed within the five years prior to the Sources Sought Synopsis issuance date. Substantially complete projects are those that are at least 80 percent completed as of the Sources Sought issuance date. Be advised that although substantially complete projects will be considered for market research purposes, if an actual solicitation is announced, all projects submitted in response to the solicitation must be 100 percent complete. REPLACE WITH: 4) Experience: Submit a minimum of three and maximum of five Government or commercial new construction contracts/projects your firm has substantially completed in the last seven (7) years, as a prime contractor, that best demonstrate your experience on projects that are similar in size, scope, and complexity to this requirement. Experience must be demonstrated in the following areas:. Construction of new aircraft maintenance hangars or similar facility with a minimum construction cost of $30,000,000.. Construction of a facility containing at least one SAPF space.. Portland cement concrete airfield pavement for heavy winged aircraft with a minimum size of 100,000 square feet.. Vertical construction project at a minimum construction cost of $50,000,000. Each project submitted must demonstrate at least one of the above criteria. Experience in each area must be met in the overall projects submitted but is not required to be shown concurrently within any single project. All projects must involve new construction of facilities; repair projects will not be considered. For each of the contracts/projects submitted for experience, provide the title, location, whether prime or subcontractor work, award and completion dates, contract or subcontract final cost, type of work, type of contract, a narrative description of the product/services provided by your firm, and customer information including point of contact, phone number and email address. Recent is defined as having been completed within the seven years prior to the Sources Sought Synopsis issuance date. Substantially complete projects are those that are at least 80 percent completed as of the Sources Sought issuance date. Be advised that although substantially complete projects will be considered for market research purposes, if an actual solicitation is announced, all projects submitted in response to the solicitation must be 100 percent complete. PLEASE SEE ATTACHED DOCUMENT TITLED N6247317S3404 SOURCES SOUGHT JSF MIRAMAR AMENDMENT 2 . The due date for Responses to this Sources Sought on 5 January 2017 remains unchanged
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711A2/N6247317S3404/listing.html)
 
Document(s)
Attachment
 
File Name: N6247317S3404_N6247317S3404_SOURCES_SOUGHT_JSF_MIRAMAR_AMENDMENT_2.pdf (https://www.neco.navy.mil/synopsis_file/N6247317S3404_N6247317S3404_SOURCES_SOUGHT_JSF_MIRAMAR_AMENDMENT_2.pdf)
Link: https://www.neco.navy.mil/synopsis_file/N6247317S3404_N6247317S3404_SOURCES_SOUGHT_JSF_MIRAMAR_AMENDMENT_2.pdf

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: MARINE CORPS AIR STATION (MCAS) MIRAMAR, SAN DIEGO, CA
Zip Code: 92145
 
Record
SN04353704-W 20161218/161216233906-28255984849940a7700362feafed3b74 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.