SOURCES SOUGHT
43 -- Industrial pumps and compressors
- Notice Date
- 7/12/2016
- Notice Type
- Sources Sought
- NAICS
- 333912
— Air and Gas Compressor Manufacturing
- Contracting Office
- Department of Energy, SLAC National Accelerator Lab, SLAC National Accelerator Lab, 2575 Sand Hill Road, Menlo Park, California, 94303, United States
- ZIP Code
- 94303
- Solicitation Number
- SLAC267415
- Archive Date
- 8/3/2016
- Point of Contact
- Stefan Lavaire Wilson, Phone: 6509263549
- E-Mail Address
-
stefanw@slac.stanford.edu
(stefanw@slac.stanford.edu)
- Small Business Set-Aside
- N/A
- Description
- Description Language: SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions Sources Sought for the following: Item description: TwisTorr 304FS Turbo System with CF6 Inlet Basic Package Deal, Includes AG Rack Controller - Complete with turbo, Controller, Connecting Cables, Inlet Screen and Controller. Specs: Pumping Speed ISO 100 / CF 6" N2 250 l/s He 255 l/s H2 220 l/s Ar 250 l/s Gas throughput at full rotational speed (with recommended forepump) Ambient Temp. (25°C) N2 170 sccm Ar 110 sccm Compression ratio & Foreline Tolerance N2 > 1 x 1011 He > 1 x 108 H2 1.5 x 106 Ar > 1 x 1011 Base pressure with recommended forepump (5 m3/h) < 1 x 10-10 mbar (< 1 x 10-10 Torr) Inlet flange CFF 8" O.D. ISO 160 CFF 6" O.D. ISO 100 Foreline flange KF16 NW (KF25 - optional) Rotational speed 60000 rpm (1010 Hz driving frequency) Start-up time < 3 minutes Recommended forepump mechanical: dry pump: Operating position Any Operating ambient temperature +5 °C to +35 °C Relative humidity of air 0 - 90 % (not condensing) Bakeout temperature 80 °C at inlet flange max (ISO flange) 120 °C at inlet flange max (CFF flange) Lubricant Permanent lubrication Cooling requirements Forced air (5- 35 °C ambient temperature) Water (mandatory if ambient temperature > 35 °C) Coolant water Minimum flow: 50 l/h (0.89 GPM) Temperature: +15 °C to +30 °C Pressure: 3 to 5 bar (45 to 75 psi) Noise Pressure level < 50 dB(A) at 1 meter Storage temperature -40° C to +70° C Max altitude 3000 m Weight kg (lbs) Pump ISO 100 Pump CFF 6'' Pump ISO 160 Pump CFF 8'' Reply to FBO posting only. SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/SLAC/STAN/SLAC267415/listing.html)
- Place of Performance
- Address: SLAC National Accelerator Laboratory, 2575 Sand Hill Road, Menlo Park, CA 94025, Menlo Park, California, 94025, United States
- Zip Code: 94025
- Zip Code: 94025
- Record
- SN04178765-W 20160714/160712234316-8ece52892bc27d714278f1e0ab680787 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |