Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 03, 2016 FBO #5306
SOLICITATION NOTICE

A -- Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction - Synopsis

Notice Date
6/1/2016
 
Notice Type
Presolicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Office of Acquisition and Grants Management, Mail Stop E62-204, 1200 New Jersey Avenue, SE, Washington, District of Columbia, 20590, United States
 
ZIP Code
20590
 
Solicitation Number
DTFH6116R00023
 
Archive Date
7/1/2016
 
Point of Contact
Tamiko Aikens, Phone: 2023663092
 
E-Mail Address
tamiko.aikens@dot.gov
(tamiko.aikens@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
The overall objective is to determine the effectiveness of State Highway Agencies (SHA) QA practices utilized on ABC projects. A thorough literature review of states QA practices for bridge construction projects shall be included. A minimum of 5 case studies with each case study consist of an individual project with varying levels of complexities and located in different regional geographical area of the United States will be documented to illustrate the effectiveness, best practices and/or issues of the existing Quality Assurance practices utilized on ABC projects. The effective practices are those in place to reduce the risk of non-specification material in and high quality proper installation and “fit up” processes for structural precast concrete elements. From the documented case studies the contractor shall develop a QA guidance document to assist highway agencies in developing a more robust inspection and acceptance programs for ABC projects. In addition, to this QA guidance document the contractor shall develop an ABC Visual-aid inspection manual similar to the Long Term Pavement Performance (LTPP) Pavement Distress Identification Manual; This synopsis is issued in accordance with FAR Part 5.203 in response to the mandatory requirement for a 15 day pre-solicitation notification. The purpose of this synopsis is to announce the Federal Highway Administration's intent to issue a solicitation for a Full and Open Competition to procure the services of an Offeror for the Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction requirement pursuant to FAR Part 19.2. As a result of this solicitation, the FHWA intends to award one Firm Fixed Price Contract. The anticipated period of performance shall not exceed 27 months. The solicitation will be issued on or about June 15, 2016.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/OAM/DTFH6116R00023/listing.html)
 
Record
SN04134675-W 20160603/160601234839-8c1154b59b8f84edd332fabb45217fdc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.