Y -- 632-15-3-5303-0162 | CONCRETE PLATFORM - Attachment

Notice Date
9/10/2015
 
Notice Type
Attachment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Veterans Affairs;VAMC Northport NY;Network Contracting Office 3 (10N3NCO);79 Middleville Rd.,Section 138, Bldg. 10;Northport NY 11768
 
ZIP Code
11768
 
Solicitation Number
VA24315R1507
 
Response Due
9/24/2015
 
Archive Date
11/23/2015
 
Point of Contact
Joseph R Ercole
 
E-Mail Address
261-4400
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
STATEMENT OF WORK A.GENERAL INFORMATION B. 1. Title of Project: Concrete Platform at VAMC, Northport, 79 Middleville Road, Northport, NY, 11768. 632-15-3-5303-0162. 2. Scope of Work: Contractor shall supply all labor, tools, materials, equipment, supplies and supervision to perform all work for the installation of a concrete platform at the Department of Veterans Affairs Medical Center, 79 Middleville Rd. Northport, New York 11768. The foundation shall be forty-five (45) feet by forty-five (45) feet by 6" thick. Concrete shall be 4000psi reinforced concrete. There shall be #5 rebar and 6"x6" #6 welded wire mesh throughout. Footings shall be to a depth of four (4) foot below grade. The slab shall be pitched for drainage.contractor shall submit shop drawings showing rebar lay-out, lengths, and fastening methods. Construction methods and workmanship shall comply with manufacturer's specifications and general accepted trade practices. Materials to be installed in permanent work shall be approved by the Government prior to installation. Contractor shall remove, cut, alter, replace, patched and repair existing work as necessary to install new work. Upon completion of contract contractor shall deliver work complete and undamaged. Construction methods and workmanship shall comply with VA requirements; see http://www.cfm.va.gov/til/spec.asp Materials and equipment accruing from any work, or part thereof shall become property of the contractor and shall be removed by the contractor from the Medical Center, however any items that are recyclable (steel, etc.) shall be properly disposed by recycling and shall be a credit to the VA government; proof of recycling with waste manifest shall be provided to the VA Contracting Officer. Prior to commencing work, general contractor shall provide proof of OSHA certified "competent person" with a 30-Hour safety certificate (cp)(29CFR 1926.20 (b) and shall maintain a presence at the work site whenever the general or sub-contractors are present and all other employees shall have a 10-Hour safety certificate issued by OSHA or other relevant competency training as determined by the D.V.A.M.C. All tools, materials, and personal property shall be secured at all times. The contractor shall be responsible for safety precautions, including warning signs and barricades during the erection of the Pre-Engineered building and have adequate personnel on hand to insure a safe working environment. The contractor is responsible for all debris and its removal from Government property. Work site shall be cleaned daily. All meetings, inspections and or work schedules must be coordinated and pre-approved prior to commencing by D.V.A.M.C. Representative. The contractor shall examine all of the work as specified to determine the full scope of work prior to any estimate given to the D.V.A.M.C. The proposal shall be in writing, original and one (1) copy. An itemized breakdown (i.e. number of hours by trade, task, and material) and each of the trade/areas listed as separate line items. The work includes but not limited to: all equipment, materials, and labor for earth work including excavation, fill, backfill, and site restoration and cast-in-place structural concrete for the foundation and slab. All work shall be performed in a safe and reliable manner. All work shall be performed as described herein and as specified in the body of the contract documents and conforming to all local, state, federal, and D.V.A.M.C. codes and regulations. All work to be performed at the Department of Veterans Affairs Medical Center 79 Middleville Rd. Northport, New York 11768 It should be noted that this contract does not involve access to VA sensitive information and does not involve access and/or connection to the VA information system. 3. Performance Period: The contractor shall commence work within fourteen (14) days following the contract award. Work shall complete within thirty (30) days of commencement unless delayed by unforeseen circumstances. 4. Type of Contract: Firm-Fixed-Price. 5. Evaluation Criteria: Lowest Price-Technically Acceptable, price factor. 6. Place of Performance: VA Medical Center, 79 Middleville Road, Northport, NY 11768. ---END---
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BroVANAP/VAMD/VA24315R1507/listing.html)
 
Document(s)
Attachment
 
File Name: VA243-15-R-1507 VA243-15-R-1507.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2308784&FileName=VA243-15-R-1507-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2308784&FileName=VA243-15-R-1507-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: VAMC Northport NY;79 Middleville Rd.;Northport, NY
Zip Code: 11768
 
Record
SN03880317-W 20150912/150911000315-c2451f29152fd880fb32668a3da88910 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.