FBO DAILY - FEDBIZOPPS ISSUE OF JULY 16, 2015 FBO #4983
AWARD

Z -- N62473-15-R-2218, CONVERT MEZZANINE TO ADMINISTRATION BUILDING 2061 (C07-12), MARINE CORPS AIR GROUND COMBAT CENTER, TWENTYNINE PALMS, CA

Notice Date
7/14/2015
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N62473 NAVFAC SOUTHWEST, 29 PALMS ROICC/CODE ROPD2 Marine Corps Air Ground Combat Center PO BOX 6013 BLDG 1138T1 Twentynine Palms, CA
 
ZIP Code
00000
 
Solicitation Number
N6247315R2218
 
Archive Date
7/29/2015
 
Point of Contact
Charlene Colella
 
E-Mail Address
<!--
 
Small Business Set-Aside
Total Small Business
 
Award Number
N6247315C2218
 
Award Date
7/14/2015
 
Awardee
DBR INVESTMENTS INC<br />
 
Award Amount
$316,116.00
 
Description
1.Demolition: Saw cut and selective demolish as required to locate sewer line from first deck restroom floor. See Sheet A-101. 2.Demolition: Provide necessary coring for water, sewer and electric utilities. See Sheet A-102 3.Demolition: Saw cut roof as required for new mechanical equipment. See Sheet A-103. 4.Demolition: Remove existing lighting from new administration area. See Sheet A-105. 5.Demolition: Modify existing fire sprinkler system to T Bar drop ceiling. See Sheet MP-6. 6.Connect sewer from first deck restroom through mezzanine floor. See Sheet A-106. 7.Connect water supply. See Sheet MP-11. 8.Install a new partition wall for administrative area and ADA restroom. Install light gauge framing along existing concrete walls. Insulate and cover with gypsum. Install double doors (see note #10 below) and closet space to enclose wall mounted electrical panels on South wall. Enclose existing ducting on North wall and overhead with new partition wall and soffit. See Sheet A-107. 9.Install (30) new 2 x 4 fluorescent ceiling light fixtures per AE Design Manual page 40 and UFC 3-530-01. 10.Provide restroom exhaust fans, heating/cooling, lighting, doors, sealed flooring, and bathroom fixtures. See Sheet A-401. 11.Install new roof top mechanical units. See Sheet A-108. 12.Administration space shall include dual electrical outlets and communication ports (spaced 10 -0 OC). 13.Install two new doors. Install a cylindrical privacy type lock base compatible in each door. Reference attached A and E Guide for the locks. 14.Reattach existing fire extinguisher per applicable fire codes. See Sheet A-403. 15.Paint the all gypsum covered walls and ceilings. See Sheet A-601 for Room Finish Schedule. 16.Replace outlets, mechanical switches and cover plates. (NOT THE COM).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711E/Awards/N6247315C2218.html)
 
Record
SN03795550-W 20150716/150714234755-ebb01b5c2d44c3bad247c0df6346071d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.