Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 01, 2014 FBO #4725
SOLICITATION NOTICE

Y -- TX FLAP FM 409(1) FM 409 Rehabilitation

Notice Date
10/30/2014
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6814B00020
 
Point of Contact
Sheri Muehl, Phone: 7209633090, Jeremiah Rogers, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
PROJECT DETAILS: TX FLAP FM 409(1), FM 409 Rehabilitation: THIS IS NOT AN INVITATION FOR BID (IFB) - PLANS AND SPECIFICATIONS ARE NOT YET AVAILABLE. This project will be tentatively advertised in mid-November, 2014 on an unrestricted (full and open) basis. The TX FLAP FM 409(1), FM 409 Rehabilitation is located in the Northeast corner of Texas by the Red River/ Oklahoma border and the closest major town is Paris, Texas. FM 409 is a 7.8 mile highway that meanders through the Bois d'Arc Creek Unit of the Caddo National Grassland Wildlife Management Area in Fannin County, Texas. The project will consist of pulverizing and reclaiming existing pavement and portion of existing subgrade for use as a new base course with a new double chip with HACP option and widening with embankment construction for 7.8 miles of FM 409. This project consists of Schedule A and Schedule B. Schedule A - Pulverizing and reclaiming existing pavement and portion of existing subgrade for use as a new base course with a new double chip and widening with embankment construction for 7.8 miles of FM 409. Schedule B - Pulverizing and reclaiming existing pavement and portion of existing subgrade for use as a new base course with a new HACP surface and widening with embankment construction for 7.8 miles of FM 409. Significant items include: Subexcavation: 6,300 CUYD Embankment Construction: 15,300 CUYD Aggregate Base: 34,200 TON Pulverization, 6 inch depth: 404 STA Surface Treatment, Designation 2A: 152, 000 SQYD (Schedule A) Superpave Pavement, ½ inch nominal maximum size aggregate: 24,800 TON (Schedule B) Guardrail System G4, Type 2, Class A Steel Posts: 2,150 LNFT Construction should begin in January 2015 and extend through June 2015. The estimated cost of this project is between $3.5 million and $ 7.5 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6814B00020/listing.html)
 
Place of Performance
Address: Fannin County, Texas, United States
 
Record
SN03561623-W 20141101/141030235401-028751b7b1315a1fcc8a0bb15f80c713 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.