Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 25, 2014 FBO #4626
MODIFICATION

Y -- CA FLAP 3050(2), Arroyo Seco Road

Notice Date
7/23/2014
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-14-B-00010
 
Point of Contact
Jeremiah Rogers, Phone: 7209633090, Jason Longshore, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
This project will be advertised as a Total Small Business Set-Aside. Only small businesses will be allowed to bid as a prime contractor. The Arroyo Seco Road project is located in the County of Monterey on California Forest Highway (FH) 129, otherwise known as Arroyo Seco Road, near Greenfield, CA in the Los Padres National Forest. The proposed project is for restoration, resurfacing, and rehabilitation of 4.7 miles of roadway between the Arroyo Seco Campground and the intersection with County Road G16 (Carmel Valley Road). Heavy seasonal traffic controls commencement and termination of construction operations. There will be uninterrupted traffic until after Labor Day up through the following Memorial Day weekend. Temperature dependent work items such as asphalt paving and pavement marking must be completed in dry conditions, for which the duration is also limited. The major work elements include pulverizing the existing road to a depth of 4" and a 3" asphalt surfacing. The primary scopes of work are slope stabilization, subexcavation, pulverization, aggregate base, asphalt pavement, drainage improvements, signing, and pavement markings. Significant quantities include: Line Item Unit Est. Quantity Subexcavation CUYD 2,600 Pulverizing, 4-inch depth STA 253 Roadway Aggregate TON 2,200 Hot Asphalt Conc. Pavem't TON 11,700 Prime Coat SQYD 71,000 Standard Underdrain LNFT 920 Concrete Curb, 18" Depth LNFT 4730 It is anticipated that this project will be advertised in mid to late July with construction occurring from late August, 2014 into early summer 2015, with winter shut-down likely. The contracting range for this project is between $3 million and $4 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-14-B-00010/listing.html)
 
Place of Performance
Address: Forest Highway 129 near Greenfield, CA., Greenfield, California, United States
 
Record
SN03434621-W 20140725/140723235106-fcfd5a529e73e0d8bc532bd75e4c25f5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.