Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 12, 2014 FBO #4583
SOLICITATION NOTICE

Y -- Beaver Lake Trailhead Construction - Drawings (DRAFT - Information Only)

Notice Date
6/10/2014
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
 
ZIP Code
98201
 
Solicitation Number
AG-05M6-S-14-0028
 
Point of Contact
Brian A. Johnson, Phone: (425) 783-6056
 
E-Mail Address
bajohnson03@fs.fed.us
(bajohnson03@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Drawings (DRAFT - Information Only) CONTRACT TYPE The Forest Service anticipates to award a Firm-Fixed-Price (FFP) construction contract from this requirement. The NAICS is 237310 - Highway, Street and Bridge Construction and the Product Service Code (PSC) is Y1LB - Construction of Highways, Roads, Streets, Bridges and Railways. PROJECT DESCRIPTION BEAVER LAKE TRAILHEAD: This project involves the construction/reconstruction of an existing trailhead parking area and includes, but is not limited to, construction surveying/staking, clearing of vegetation, excavation, embankment, subgrade construction, aggregate surfacing, trail construction, supply/installation of a CXT or approved equal toilet building and sign fabrication/installation. This is a construction project and the Davis-Bacon Act (DBA) applies. ESTIMATED DATE SOLICITATION WILL BE ISSUED June 24, 2014 BID BOND / PERFORMANCE & PAYMENT BONDS REQUIRED Bid Bond, Performance & Payment Bonds may be required. DESIRED START DATE July 14, 2014 PERIOD OF PERFORMANCE 120 Calendar Days PROJECT LOCATION (DRIVING DIRECTIONS) The project is located in Snohomish County. T31N - R10E - Sec. 14. From I-5 at Arlington, WA, take State Route 530 east to the town of Darrington, WA. In Darrington, take the Mtn. Loop Highway South to milepost 44.7 and the project location will be on the right (project is on the south side of the Mtn. Loop Hwy and directly across from Forest Road 22 and the Whitechuck Bridge). Maps of the project area can be purchased at the Darrington Ranger Station. PRE-BID CONFERENCE A pre-bid conference will not be held. Bidders are advised to visit the project site prior to bidding to be familiar with the project area and designated waste/borrow sites. DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS (FAR 36.204) Between $100,000 and $250,000. DRAWINGS Refer to attached DRAFT drawings. TECHNICAL POINTS OF CONTACT Mr. Luke Silvis, lesilvis@fs.fed.us, (360) 854-2624 (Primary) Mr. Jim Mitchell, jbmitchell@fs.fed.us, (360) 854-2620 (Secondary)
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-14-0028/listing.html)
 
Place of Performance
Address: Darrington Ranger District, (Snohomish County), 1405 Emens Avenue N., Darrington, Washington, 98241, United States
Zip Code: 98241
 
Record
SN03390301-W 20140612/140610235200-2f190de8166d558e9cae1f89ffa29deb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.