MODIFICATION
61 -- Purchase and installation of transformers
- Notice Date
- 9/5/2012
- Notice Type
- Modification/Amendment
- Contracting Office
- BIA - Western Regional Office Division of Acquistion - Western2600 N. Central Avenue, Suite 400 Phoenix AZ 85004
- ZIP Code
- 85004
- Solicitation Number
- A12PS02132
- Response Due
- 9/10/2012
- Archive Date
- 9/5/2013
- Point of Contact
- Ricky Mills Contract Specialist 60224145661446 ricky.mills@bia.gov;
- E-Mail Address
-
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
- Small Business Set-Aside
- Total Small Business
- Description
- Due date to be extend to 09/10/2012 at 8 P.M. Eastern Time. Here are the answers to all questions that were received. 1.The contractors can assume that all 15 transformers are PCB contaminated and it's the responsibility of the contractor to properly and legally dispose of these items as required by regulation, local, state, or federal law requires. 2.In order to determine the feasibility of replacing transformers, without an extended complete campus shutdown, as well as the optimum sequence for replacement, it will be necessary to know how the primary power is distributed to the transformers on campus. Please provide a single line diagram of the entire campus 12kv distribution system (including the transformers which are not being replaced under this project). If manholes and pull boxes are not indicated on the single-line diagram, then also provide a layout of the 12kv distribution which indicates these. a.We do not have a 12KV power distribution diagram. That is the reason for turning off the total campus power is the only practical method of transformer replacement. 3.Different styles of existing pad mount transformers, live front & dead front, were observed at the site. Please provide a list of which existing transformers are dead font and which are live front construction. a.We do not have a list of dead or live front transformers. 4.SOW paragraph 4-D includes that statement for the replacement of the ATS that "all breakers shall be new and match existing breaker ampere". Do any circuit breakers require replacement, or is this intended to apply to breaker type transfer switches if proposed? If other circuit breakers require replacement, then provide a single line diagram indicating location. a.We are only replacing the Automatic Transfer Switch. No breaker replacement. To clarify, this solicitation is being treated as a commercial item and FAR Part 12 (commercial) is being utilized. Other clauses in the FAR will be utilized if they are used commercially. As with the use of Part 36, Part 22 applies to Part 12 when construction work is being performed. Please see below for the Davis Bacon Act wage determination and provision. 52.222-6 -- Davis-Bacon Act; 52.222-7 -- Withholding of Funds; 52.222-8 -- Payrolls and Basic Records; 52.222-9 -- Apprentices and Trainees; 52.222-10 -- Compliance with Copeland Act Requirements; 52.222-11 -- Subcontracts (Labor Standards); 52.222-12 -- Contract Termination - Debarment; 52.222-15 -- Certification of Eligibility; 52.222-13 -- Compliance with Davis-Bacon and Related Act Regulations; 52.222-14 -- Disputes Concerning Labor Standards. 52.236-2 -- Differing Site Conditions; 52.236-5 -- Material and Workmanship; 52.236-6 -- Superintendence by the Contractor; 52.236-7 -- Permits and Responsibilities; 52.236-9 -- Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements; 52.236-10 -- Operations and Storage Areas; 52.236-11 -- Use and Possession Prior to Completion; 52.236-12 -- Cleaning Up; 52.236-13 -- Accident Prevention; 52.236-14 -- Availability and Use of Utility Services. 52.228-15 Performance and Payment Bond. Pprovision and clauses can be viewed at http://farsite.hill.af.mil/vffar.htm The wage determination is from Riverside, CA, Riverside County and can be found at the WDOL website under CA36. If there is another classification that you feel is appropriate, please indicate. Below is class specific WD: LINE CONSTRUCTION Rates Fringes (1) Lineman; Cable splicer.. $ 48.95 14.05 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)........... $ 39.09 12.97 (3) Groundman............... $ 29.91 12.70 (4) Powderman............... $ 43.71 13.15 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day. For Laborer and other rates, please refer to the WDOL website using CA36 as the search criteria.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BIA/RestonVA/A12PS02132/listing.html)
- Place of Performance
- Address: Sherman Indian High School, 9010 Magnolia Avenue, Riverside, CA 92503
- Zip Code: 92503
- Zip Code: 92503
- Record
- SN02869003-W 20120907/120906001831-b7b7b0c728253e6d1c57d806dcea7707 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |