Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 03, 2012 FBO #3813
MODIFICATION

Y -- R1 IMAT: Clearwater National Forest - Musselshell Creek Channel Relocation - Solicitation 1

Notice Date
5/1/2012
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-12-0063
 
Response Due
5/31/2012 12:30:00 PM
 
Point of Contact
Rita J. Loper, Phone: 2087657497, Chuck Fowlds, Phone: 208-467-8369
 
E-Mail Address
rloper@fs.fed.us, cfowlds@fs.fed.us
(rloper@fs.fed.us, cfowlds@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
7 - Detour Plan 6 - Owner Past Performance Survey 5 - Bid Bond Form 4 - Workers Comp Verificatoin 3 - Drawings 2 - Specifications 1 - Wage Determination Solicitation R1 Idaho-Montana Acquisition Team (IMAT) for the Clearwater National Forest AG-02RC-S-12-0063 The project consists of relocating Musselshell Creek adjacent to Forest Service Road No. 540, milepost 3.65. The current channel goes through "Musselshell Tunnel." A 400 linear feet of channel will be realigned around the tunnel. Improvements consist of, but are not limited to, dewatering and rewatering the site, excavating material to shape and regrade the stream channel, installing streambed simulation material, installing instream structures for habitat, installing a new cross drain culvert, revegetating and seeding disturbed areas, realigning and surfacing Road No. 540 for approximately 350 linear feet and excavation and embankment of the roadway. The project is located on the Lochsa Ranger District, Clearwater National Forest, Idaho County, Idaho. From Kamiah, Idaho travel to MP 28.8 on FS Road 100, Glenwood Road, and turn right at junction of FS Road 535. Continue on Road 535 to MP 1.9 and the junction of FS Road 540 on the left. The project site is located at MP 3.65 on FS Road 540. The price range is between $100,000 and $250,000. The period of performance expected to be from mid-June through October 31, 2012. This is a HUBZone Small Business set-aside project.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-12-0063/listing.html)
 
Place of Performance
Address: Clearwater National Forest, 12730 Highway 12, Orofino, Idaho, 83544, United States
Zip Code: 83544
 
Record
SN02735373-W 20120503/120501235104-cee81bfc331ad48f8e2944d237e385c2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.