Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 28, 2012 FBO #3808
MODIFICATION

Y -- WY PRA GRTE 13(7) North Park Road, Jackson Lake Lodge to Leeks Marina - Amendment 2

Notice Date
4/26/2012
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Western Federal Lands Highway Division, 610 East Fifth Street, Vancouver, Washington, 98661-3801
 
ZIP Code
98661-3801
 
Solicitation Number
DTFH70-11-R-00004
 
Point of Contact
Contracts G. Office, Phone: (360)619-7520
 
E-Mail Address
WFL.Contracts@dot.gov
(WFL.Contracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Amendment A001a (corrects Amend A001) ****** 4/26/2012 - Amendment A001 posted today included the wrong attachments. Find attached the CORRECTED amendment... labeled Amendment A001a. ************* 9/15/11 - UPDATE The project work has changed since the March 2011 posting. See Updated Project Description, Prelim Letter and Preliminary Plans. This project is anticipated to be advertised in Winter/Spring 2012. Estimated price range is $10 million to $15 million. Work is tentatively scheduled for completion October 2013. This project is being advertised with an Economic Price Adjustment specification. NOTICE OF SUBCONTRACTING OPPORTUNITY - This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. See initial posting (below) for additional information. ******************************************** WY PRA GRTE 13(7) North Park Road, Jackson Lake Lodge to Leeks Marina This project is anticipated to be advertised in June 2011. Estimated price range is $10 million to $15 million Work is tentatively scheduled for completion in the Fall 2012. This project is being advertised with an Economic Price Adjustment specification. IMPORTANT NOTICE: This project was initially solicited in combination with WY PLD GRTE 700(1) Grand Teton Park Pathways, Phase 2 under solicitation number DTFH70-11-R-00002 at: https://www.fbo.gov/spg/DOT/FHWA/WFL/DTFH70-11-R-00002/listing.html. • Today the North Park Road is being re-issued separately under this posting as solicitation number DTFH70-11-R-00004. On October 6, 2010, Preliminary Plans for the North Park Road were posted at: https://www.fbo.gov/spg/DOT/FHWA/WFL/DTFH70-11-R-00002/listing.html. • The Pathways project will retain the DTFH70-11-R-00002 solicitation number and be issued at the above link, while this North Park Road project will be issued here at this link. NOTICE OF SUBCONTRACTING OPPORTUNITY - This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: http://www.wfl.fhwa.dot.gov/contracting/construction/idiq/ygt.htm COP Construction LLC Contract No. DTFH70-10-D-00009 Address: P.O. Box 20913 Billings, MT 59104 Phone: (406) 656-4632 HK Contractors, Inc. Contract Number: DTFH70-07-D-00007 Address: P.O. Box 51450, Idaho Falls, ID 83405 Phone: (208) 523-6600 M. A. DeAtley Construction Contract No. DTFH70-10-D-00010 829 Evans Road Clarkston, WA 99403 Phone: (509) 751-1580 Morgen & Oswood Construction Co. Contract No. DTFH70-10-D-00011 P.O. Box 3009 Great Falls, Montana 59403 Phone: (406) 761-1420 Oftedal Construction Contract No. DTFH70-10-D-00012 434 MT 59N Miles City, Montana 59301 Phone: (307) 237-4499 Kiewit Western Contract Number: DTFH70-07-D-00008 Address: 7926 S. Platte Canyon Rd., Littleton, CO 80128 Phone: (303) 979-9330 is located in Grand Teton National Park, Teton County, Wyoming. This 13 mile long project will take place in several locations along Highway 89. The first site will consist of concrete repair on a large concrete box culvert. The second site involves large scale riprap placement and erosion control. The third site involves the widening of 6.5 miles of Highway 89 and consists of excavation, embankment, grading, aggregate base, asphalt concrete paving, drainage, and replacement of guardrail on an existing bridge structure. The fourth site primarily involves a 1.5-inch asphalt overlay on 6.5 miles of Highway 89; work will consist of asphalt paving, striping and minor slope repairs. See posted "Description of Work" for additional details.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/WFL/DTFH70-11-R-00004/listing.html)
 
Place of Performance
Address: Grand Teton National Park, Moose, Wyoming, 83012, United States
Zip Code: 83012
 
Record
SN02731799-W 20120428/120426235020-479b2db66f82103720744bbf74230004 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.