Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 13, 2012 FBO #3793
SOLICITATION NOTICE

56 -- Baldhill Dam Roof Insulation - SF-1449

Notice Date
4/11/2012
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238310 — Drywall and Insulation Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, St. Paul, Attn: CEMVP-CT, 180 East Fifth Street, St. Paul, Minnesota, 55101-1678, United States
 
ZIP Code
55101-1678
 
Solicitation Number
W912ES-12-T-0080
 
Archive Date
5/3/2012
 
Point of Contact
Jesse Onkka, Phone: 6512905444, Christopher G. Dake, Phone: 6512905415
 
E-Mail Address
Jesse.L.Onkka@usace.army.mil, christopher.dake@us.army.mil
(Jesse.L.Onkka@usace.army.mil, christopher.dake@us.army.mil)
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Combined Synposis/Solicitation SF-1449 Baldhill Dam Shop Building Roof Spray Foam Insulation Project SOW Apply a minimum of 2-inches of closed cell Sprayed Polyurethane Foam (SPF) insulation for roofing onto a corrugated steel roof that measures approximately 21 feet to peak with a length of 120 feet for each side of the roof. Approximate total roof area is 120 ft X 21 ft X 2 = 5,040 square feet. Contractor is responsible determining the actual measurements to ensure the project is completed satisfactorily. Complete roof preparation according to manufacturers specifications to include at least washing the surface and prime any rusted areas. The spray foam must be applied in a seamless/fully adhered fashion and according to manufacturer's recommendation. The spray foam must be rated with a service life of 20 plus years and have an R value of at least 6+/inch and have a Density Property (pcf) value greater than 2.9 using test method ASTM D 1622. Apply a protective elastomeric moisture-cure silicone rubber roof coating system that is vapor permeable having the ability to "breathe" designed for use over spray-in-place polyurethane foam with embedded standard roofing granules in stages according to manufacturer's instructions to provide a tensile strength of at least 225 PSI at 75 degrees Fahrenheit using test method ASTM D-412, with a permeability greater than 4 using test method ASTM E-96, Procedure B and with the minimum combined cured thickness of basecoat(s) and topcoat of at least 15 mils. First stage(s) will be grey and the final stage will be white without any grey showing. The applicator must show proof of certification of training to apply the material used. EM 385-1-1, Corps of Engineers Safety Manual guidelines will be adhered to during the duration of the contract. Shop Building physical address: Baldhill Dam, US Army Corps of Engineers, 2630-114 th Ave SE, Valley City, ND 58072. Completion date of June 30, 2012. Contractor shall provide a 1-year warranty of the product and any Manufacturer's standard commercial warranty for the product that exceeds the 1-year minimum.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA37/W912ES-12-T-0080/listing.html)
 
Place of Performance
Address: North Dakota, United States
 
Record
SN02719329-W 20120413/120411235029-44b130f07177b777da6acd0e065b611c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.