Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 17, 2012 FBO #3766
SOURCES SOUGHT

J -- Repairing Power PC CCA's for AN/SPS 73 Radar - DRAFT SOW

Notice Date
3/15/2012
 
Notice Type
Sources Sought
 
NAICS
811219 — Other Electronic and Precision Equipment Repair and Maintenance
 
Contracting Office
Department of Homeland Security, United States Coast Guard (USCG), USCG Surface Forces Logistics Center (SFLC), 2401 Hawkins Point Road, Building 31, Mail Stop 26, Baltimore, Maryland, 21226-5000, United States
 
ZIP Code
21226-5000
 
Solicitation Number
POWER_PC_CCAs
 
Archive Date
3/28/2012
 
Point of Contact
Ashley A Fetherman, Phone: 410-762-6416, Mark Balderelli, Phone: 410-762-6382
 
E-Mail Address
ashley.a.fetherman@uscg.mil, mark.j.balderelli@uscg.mil
(ashley.a.fetherman@uscg.mil, mark.j.balderelli@uscg.mil)
 
Small Business Set-Aside
N/A
 
Description
SOW (Draft) The U.S. Coast Guard Surface Forces Logistics Center, MEC Product Line, is issuing this notice as a Request for Information regarding the attached Draft Statement of Work for repairing Power PC Circut Card Assemblies, used on the 73 AN/SPS Radar system. Your response to the following questions are requested, in writing, to: Ashley.A.Fetherman@uscg.mil AND Mark.J.Balderelli@uscg.mil by 2:00pm EST 23 March 2012. Responses received after this date and time may not be considered. Please reference "Power PC Cards" in the subject line of the email. 1) Is the SOW clear? If not, please explain what is not clear? 2) Is the Circuit Card Assembly (CCA) Ready For Issue condition (RFI) explicit? 3) Is item inspection criteria clear and achievable? 4) Does the CCA repair time met industry standards for this type of repair and is it attainable? 5) Are there any foreseeable issues in attaining repair parts or materials? 6) Does the status report provide a meaningful tracking tool for industry and are the requirements feasible? 7) Is Coast Guard post repair testing of RFI CCAs appropriate to warranty repairs if the CCA does not met the criteria? 8) Does the Government Furnished Property (GFP) facilitate repairs and are the associated GFP requirements achievable? 9) Are additional equipment/system components required to repair/test CCAs? 10) Are there any issues associated with CCA inspection, testing, and repair as proposed in the SOW? 11) Were any issues installing third party software for proposed testing identified? 12) Is SOW reporting criteria clear and achievable? 13) Are the Preservation, Packing, and Marking requirements clear and achievable? 14) Can the SOW be improved to attain better success in executing the contract? This notice is for the purpose of conducting market research only. Proposals are not being requested at this time, and the Government does not intend to pay for any information that is submitted.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCG/USCGELC/POWER_PC_CCAs/listing.html)
 
Record
SN02697849-W 20120317/120315235058-526bf52df1e26e8c57c4d08b96804bee (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.