Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 26, 2012 FBO #3746
MODIFICATION

A -- Amendment 1 to Combat Tempered Platform Demonstration

Notice Date
2/24/2012
 
Notice Type
Modification/Amendment
 
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
 
Contracting Office
ACC-RSA-AATD - (SPS), ATTN: AMSRD-AMR-AA-C, Building 401, Lee Boulevard, Fort Eustis, VA 23604-5577
 
ZIP Code
23604-5577
 
Solicitation Number
W911W6-12-R-0015
 
Response Due
3/15/2012
 
Archive Date
5/14/2012
 
Point of Contact
hope mcclain, 757-878-2993
 
E-Mail Address
ACC-RSA-AATD - (SPS)
(hope.a.mcclain@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
This amendment removes first paragraph "Synopsis" in its entirety. Additionally, the amendment adds a clarifying sentence to the last paragraph of the "Requirements" Section of the announcement. The revised paragraph is below in its entirety. The main product of CTPD is a fully coordinated revised system specification that represents the operationally durable, total survivable, integrated, and optimized technology suite demonstrated. The Government will use the Combat Tempered Platform System Specification for informing Government doctrinal, material developers and resource managers in making requirements and funding decisions. A fully coordinated Technology Transition Plan and validated metric contributions are essential in obtaining the necessary support to transition this technology and ultimately implement the revised system specification. ------------- Question received in response to BAA: The BAA states: Technology transition is critical for the success of this effort, so it is expected that Offerors have already begun to coordinate the initial CTP solution and Technology Transition Plan with the appropriate PMO(s). The main product of CTPD is a fully coordinated revised system specification that represents the operationally durable, total survivable, integrated, and optimized technology suite demonstrated. A fully coordinated Technology Transition Plan and validated metric contributions are essential in obtaining the necessary support to transition this technology and ultimately implement the revised system specification. What is AATD requesting the Offerors submit with the proposal? What constitutes a fully coordinated transition plan? Government Answer: As with any Broad Agency Announcement, offerors are encouraged to provide the information necessary to substantiate that their abilities to achieve the goals the Government sets out in the solicitation. Offerors responding to this BAA should use their best judgment in providing the information necessary for the Government to determine the state of coordination of their proposed CTP solution with the both the Government and Industry PMOs substantiating progress of coordination, as well as a plan to fully coordinate a TTP during CTPD. Please reference the technical proposal preparation instructions, specifically the areas of Sections 2-5 that discuss transition, as well as the evaluation criteria 1-3 that show how transition will be evaluated for additional guidance.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/54d76def45154e55baa1f6d5a8f98275)
 
Place of Performance
Address: ACC-RSA-AATD - (SPS) ATTN: CCAM-RDT, Building 401, Lee Boulevard Fort Eustis VA
Zip Code: 23604-5577
 
Record
SN02682416-W 20120226/120224234726-54d76def45154e55baa1f6d5a8f98275 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.