H -- Inspect, Test, Maintenance, Calibration, and Single Line drawings of electrical power distribution system. - Attachment

Notice Date
12/23/2011
 
Notice Type
Attachment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of Veterans Affairs;Rocky Mountain Network;VISN 19 Contracting;4100 E. Mississippi Avenue, Suite 1110;Glendale CO 80246
 
ZIP Code
80246
 
Solicitation Number
VA25912Q0007
 
Response Due
12/27/2011
 
Archive Date
1/26/2012
 
Point of Contact
Glenn Breitling
 
E-Mail Address
othill
 
Small Business Set-Aside
N/A
 
Description
Modification 002, 12/23/2011 to Solicitation VA-259-12-Q-0007, Inspect, Test, Maintenance, Calibration and Single Line Drawings of Electrical Power Distribution System The following clarifications are the result of questions from the facility walk through on December 20, 2011. 1.All low voltage breakers shall be tested in conformance to manufacturer ™s secondary injection testing method. 2.Primary testing method of circuit breakers will only be on the medium voltage breakers of the main distribution switch (Square D, 13.2 Kv). 3.Inspection, testing, maintenance and calibration shall occur within a two week period. This is dependent on the vendor ™s dispatch of personnel and approved schedule. The schedule as submitted by the vendor shall utilize weekends and those hours outside of the normal work days of the Medical Center. 4.Shutdown of mechanical systems, fire alarm system, steam generation, chilled water system and other equipment shall be coordinated by the vendor at the utility plant, Building 9. Additional coordination resulting in assistance from VA Maintenance & Operations staff, if needed, shall be through the Maintenance & Operation Foreman. 5.The spare circuit breaker, Main switch (Square D, 13.2Kv) shall be tested. 6.No ultrasound testing on 13.2Kv cabling. 7.Junction boxes will not be inspected. Pull boxes containing cable splices located in the ceiling of 1215-1 shall be inspected visually and by infrared. 8.Delete requirement for testing of North generator set (4D. page 10 of 60). 9.An updated file is available on the electrical panels. ZIP PDF updated Panel Schedules. Contact the contracting officer at glenn.breitling@va.gov to receive the file.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/SLCVAMC660/SLCVAMC660/VA25912Q0007/listing.html)
 
Document(s)
Attachment
 
File Name: VA-259-12-Q-0007 VA-259-12-Q-0007_3.doc (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=283779&FileName=VA-259-12-Q-0007-003.doc)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=283779&FileName=VA-259-12-Q-0007-003.doc

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Grand Junction VA Medical Center;2121 North Avenue;Grand Junction, CO 81501
Zip Code: 81501
 
Record
SN02645385-W 20111225/111223234007-f697b2b92d79cd550924c21eb7f5d491 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.