Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 25, 2011 FBO #3592
SOLICITATION NOTICE

Y -- Los Alamitos Readiness Center/Headquarters - Solicitation

Notice Date
9/23/2011
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, National Guard Bureau, USPFO for California, PO Box 8104, San Luis Obispo, California, 93403-8104
 
ZIP Code
93403-8104
 
Solicitation Number
W912LA-11-R-0010A
 
Archive Date
11/18/2011
 
Point of Contact
Raj Cooper, Phone: 8055946216
 
E-Mail Address
raj.cooper@us.army.mil
(raj.cooper@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
GEOTECHNICAL REPORT, ADDENDUM 1 GEOTECHNICAL REPORT SPECIFICATIONS LARC - PLUMBING ATTACHMENT 9 LARC - FIRE PROTECTION ATTACHMENT 8 LARC - STRUCTURAL ATTACHMENT 7 LARC - MECHANICAL ATTACHMENT 6 LARC - LANDSCAPE ATTACHMENT 5 LARC - KITCHEN ALL ATTACHMENT 4 LARC - ELECTRICAL TELECOMMUNICATION ATTACHMENT 3 LARC - CIVIL ATTACHMENT 2 LARC - ARCHITECTURAL ATTACHMENT 1 Exhibit F Exhibit E Exhibit D Exhibit C Exhibit B Exhibit A Solicitation Site improvement of a 7.6 acres site including: demolition and site preparation for the construction of the facilities and site amenities including hard- and soft-scape, detention basin, parking lots, site lighting, dry and wet utilities, new roadways, fences and gates. Construction of a single 75,000 gsf facility consisting of a two story central structure containing open and closed office space, conference rooms, emergency operating center (E.O.C.) and lobby/entry ways and a one-story support structure that includes offices, kitchen, restrooms, locker rooms, classrooms/library unit storages, weapon vault, and break rooms. The building complex is a steel frame structure with non-load bearing veneer consisting of masonry, pre-finished metal panel, and glazed curtain wall components. The flat roof, mainly at the 2-story portion, is composed of rigid insulation with SBS roofing system. The majority of the roof at the single-story facility is a low-sloped standing seam metal panel system. The facility is mechanically heated, cooled and protected with an automatic sprinkler system. The primary building electrical service is from the existing Government switch gear, and the building service voltage is 480Y/277V 3-phase, 4-wire system. Voice and data connectivity is provided via single mode fiber optic cabling and copper cabling. Sustainable Design: The project is designed and shall be constructed to achieve a minimum of LEED NC - Silver Rating (Version 2.2).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA04/W912LA-11-R-0010A/listing.html)
 
Place of Performance
Address: The Los Alamitos Joint Forces Training Base, Los Alamitos, California, 90720, United States
Zip Code: 90720
 
Record
SN02590307-W 20110925/110923235729-bfcdcbb6aabb9494c16d774e8a944d59 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.