Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 12, 2011 FBO #3579
MODIFICATION

47 -- Fire Suppression System - Mobility/Training Facility

Notice Date
9/10/2011
 
Notice Type
Modification/Amendment
 
NAICS
332996 — Fabricated Pipe and Pipe Fitting Manufacturing
 
Contracting Office
Department of the Air Force, Air Combat Command, 99 CONS, 5865 Swaab Blvd, Nellis AFB, Nevada, 89191-7063, United States
 
ZIP Code
89191-7063
 
Solicitation Number
F3GHBA1227A001
 
Archive Date
9/28/2011
 
Point of Contact
Gregory L. Williams, Phone: 7026529573
 
E-Mail Address
gregory.williams@nellis.af.mil
(gregory.williams@nellis.af.mil)
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
***Customer Responses to Vendor Questions.*** Q. In the SOW it states - "The contractor will also develop a bill of materials (BOM) to match the 100% design. The assembly of the system will be provided by the Contractor. No labor is required. Each Offeror shall be responsible for obtaining any documents not attached as part of this RFP but referenced as criteria for the project. The system will be installed and certified by government provided labor, no Contractor labor is required." The verbiage is contradictory does the contractor have to include installation or not? A. All installation will be done by troop labor, not contractor labor is required. Q. In the plans on page (sheet) SF-4 of Building 10156 check head layout on section view on the open web trusses? A. There is a sprinkler layout. Q. Second floor sheet SF-3 check sprinkler head layout? A. There is a sprinkler layout. Q. When will the supply riser be brought into building? Will it be brought into building per sheet SF-1? A. The rise will be brought into the building according to the drawings. Materials should be provided in order to bring the riser into the building from an existing 6" line. See FS-4 Q. Can this RFQ due date be pushed back a day to 9/13/2011? A. The due date can be pushed 24 hours. Q. Please clarify does the contractor have to supply the installation or not? A. All installation will be done by troop labor, not contractor labor is required. ***Solicitation has been extended to 13 Sept 11 @ 1200 PST.***
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/99CONS/F3GHBA1227A001/listing.html)
 
Place of Performance
Address: Nellis AFB, Las Vegas, Nevada, 89191, United States
Zip Code: 89191
 
Record
SN02571012-W 20110912/110910233626-2df07cfa5e58297998d0d71e6af3ab16 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.