Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 11, 2011 FBO #3578
MODIFICATION

Z -- WARD MOUNTAIN CAMP GROUND RECONSTRUCTION - FINAL PROJECT PLANS

Notice Date
9/9/2011
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise,, Idaho, 83709, United States
 
ZIP Code
83709
 
Solicitation Number
AG-0261-S-11-0033
 
Archive Date
10/6/2011
 
Point of Contact
Steve R Roehr, Phone: 702-839-5575, CHARLENE BYRD, Phone: 702-839-5561
 
E-Mail Address
sroehr@fs.fed.us, cbyrd@fs.fed.us
(sroehr@fs.fed.us, cbyrd@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
TESTED, PRINTABLE FILE OF PROJECT PLANS Accepting offers from HubZone certified contractors to perform the following Construction Contract: 1.1 SCOPE OF CONTRACT A. This project consists of the reconstruction of the Ward Mountain Campground on the Ely Ranger District on the Humboldt - Toiyabe National Forest. B. The work associated with this project includes: 1. Removal and disposal of existing structures and site furnishings. 2. Obliterating, scarifying, and re-contouring existing roads and paths. 3. Reconstruction of campground roads, pullouts, parking areas, back-in spurs and pull-through spurs. 4. Installing new culverts and signs for roadways. 5. Installing a new water system including a pump house utility building, electrical tie-in, distribution lines, hydrants, chlorinator and valve boxes. 6. Installing government furnished restrooms with concrete pathways. 7. Constructing a new volleyball court, horseshoe pits, post and pole fencing. 8. Constructing a new aggregate pathway system. 9. Installing new site features, including site identification signs, wheelstops, bulletin boards, kiosks, unit markers, and Gov't. furnished fee tube. 10. Constructing a host unit, including: electrical tie-in and on-site wastewater disposal system. 11. Constructing new concrete and aggregate group sites with shelters and site furniture. 12. Construction of new concrete amphitheater stage, guardrail and seating. 13. Construction of new aggregate family units with site furniture, tent pads, and aggregate paths. C. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. D. Quantities associated with these options are identified in the Schedule of Items. E. Government Furnished Items: 1. Vault Toilet Buildings F. Bid Option #1: 1. Amphitheater and associated items. The Magnitude is between $1 million and $5 million There was a Pre-bid meeting on-site September 7, 2011 10:00 AM Pacific. The sign in sheet has been posted to this advertisement. There will be another site visit on September 15, 2011 at 10:00 AM Local Time. After this site visit, an amendment will be prepared to the solicitation covering questions and clarifications from both meetings. Both meetings are identical in nature, and the second was simply added for overflow, and to reduce requests for visits to the COR who is remote to the project site. There would be no reason to go on the 15th, if you attended on the 7th. Neither are mandatory. Many parties are having trouble printing the project plans which have been provided to date. We have posted two different files so far. I am posting a third file now. This third file set has be print tested in three different locations, and it should work for anyone who has been unable to print the plans until now. There are no autocad files available for distribution. All inquiries regarding this project shall be IN WRITING VIA E-MAIL to Contracting Officer at sroehr@fs.fed.us Added: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][added_on]" value="2011-08-24 15:16:58">Aug 24, 2011 3:16 pm Modified: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][modified_on]" value="2011-09-09 16:35:04">Sep 09, 2011 4:35 pm Track Changes The Site Walk/Pre-bid meeting is to be held on site at the Ward Mountain Campground on September 7 and 15, 2011 at 10:00 AM. Interested vendors meet the CO and COR at the entrance of the campground. Directions to the site: From Ely, Nevada, take Highway 6 south towards Tonopah 10 miles to Murray Summit. Turn left just before the summit at the Forest Service sign for Ward Mountain Recreation Area and Campground. From Las Vegas, Nevada, take Hwy 93 north 86 miles to the junction with SR 318. Follow SR 318 124 miles north to Murray Summit. Turn right at the Ward Mountain Recreation Area and Campground sign.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-11-0033/listing.html)
 
Place of Performance
Address: 1.2PROJECT LOCATION, A.The project is located in the Ely Ranger District of the Humboldt - Toiyabe National Forest, White Pine County, NV, in Sections 35, T16N, R62E. It is located approximately 10 miles southwest of Ely, NV off state highway 6., Ely, Nevada, 89301, United States
Zip Code: 89301
 
Record
SN02569145-W 20110911/110909235552-8c135065a673a16057430e65a6f8588a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.