Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 10, 2011 FBO #3577
SOLICITATION NOTICE

66 -- Process Reactor System with Scrubber and Circulator

Notice Date
9/8/2011
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
334516 — Analytical Laboratory Instrument Manufacturing
 
Contracting Office
MICC - Dugway Proving Ground, Division of Contracting, Building 5330 Valdez Circle, Dugway, UT 84022-5000
 
ZIP Code
84022-5000
 
Solicitation Number
W911S611T0083
 
Response Due
9/20/2011
 
Archive Date
11/19/2011
 
Point of Contact
Sandra Johnson, 435-831-2756
 
E-Mail Address
MICC - Dugway Proving Ground
(sandra.j.johnson90.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The Mission & Installation Contracting Command - Dugway Proving Ground office is contemplating the procurement of a short 50 liter jacketed process reactor system complete setup, a large gas scrubber setup with mobile support stand, and a 510w water cooled Unistat circulator system, installed with one day of training. An itemized list of components follows the clauses below. Note: Funding for this requirement is not currently available. This requirement is for process to point of award only (reference FAR 52.232-18). Interested vendor's wishing to respond to this solicitation must provide pricing valid for a calendar period of one hundred twenty (120) calendar days. This announcement constitutes the only solicitation requested and a written solicitation will not be issued. This is a notice of intent to negotiate on a sole source basis with Chemglass Life Sciences, LLC 3800 N. Mill Rd. Vineland, NJ 08360-1528. Pursuant to 10 U.S.C. 2304 ( C ) (1) and Federal Acquisition Regulation 6.302-1, supplies, services and / or equipment are available from one responsible source and no other type of supplies, services and / or equipment will satisfy agency requirements. Supporting evidence must be furnished to demonstrate the ability to comply with the government's requirements. The solicitation is issued as a request for quote (RFQ). Submit written offers on RFQ W911S6-11-T-0083. All firms responding must be registered with the Central Contractor Registration (CCR). North American Industrial Classification Standard 334516 (500 employees) size standard in numbers of employees applies to this procurement. The following provisions and/or clauses apply to this RFQ: FAR 52.212-1 Instructions to Offerors - Commercial Items; FAR 52.212-3 ALT I Offeror Representations and Certifications -- Commercial Items, applies to this solicitation: FAR 52.212-4 Contract Terms and Conditions - Commercial Items; FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items. Additional FAR clauses required: FAR 52.204-7, Central Contractor Registration: FAR 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards; FAR 52.209-6, Protecting the Government's Interest When Subcontracting With Contractor's Debarred, Suspended or Proposed for Debarment; FAR 52.219-6, Notice of Total Small Business Set-Aside; FAR 52.219-28, Post Award Small Business Program Representation; FAR 52.222-3, Convict Labor; FAR 52.222-19, Child Labor-Cooperation with Authorities and Remedies; FAR 52.222-21, Prohibition of Segregated Facilities; FAR 52.222-26, Equal Opportunity; FAR 52.222-36, Affirmative Action for Workers with Disabilities; FAR 52.223-18, Contractor Policy to Ban Text Messaging While Driving; FAR 52.225-13, Restrictions on Certain Foreign Purchases (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury); FAR 52.232-18, Availability of Funds: FAR 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration; FAR 52.247-34, FOB: Destination (Accountable Property Officer, Building 5464, Dugway Proving Ground, Dugway, Utah, 84022). DFARS clauses required: DFARS 252.203-3, Gratuities; DFARS 252.203-7000, Requirements Relating to Compensation of Former DoD Officials; 252.203-7002, Requirement to Inform Employees of Whistleblower Rights; DFARS 252.204-7003, Control of Government Personnel Work Product; DFARS 252.204-7004 Alt A, Central Contractor Registration; DFARS 252.211-7003 Item Identification and Valuation; DFARS 252.212-7001 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items; DFARS 252.225-7001, Buy American Act and Balance of Payments Program; DFARS 252.225-7035, Buy American Act - Free Trade Agreement - Balance of Payments Program Certificate; DFARS 252.225-7036, Buy American Act-Free Trade Agreements-Balance of Payments Program Certificate; DFARS 252.227-7015, Technical Data-Commercial Items; DFARS 252.227-7037, Validation of Restrictive Markings on Technical Data; DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports; DFARS 252.232-7010, Levies on Contract Payments; and 252.247-7023 ALT III, Transportation of Supplies by Sea. The following local clauses apply to this solicitation: 52.000-4001, Foreign Visitors / Employees; 52.000-4002, Location of U.S. Army Dugway Proving Ground; 52.000-4003, Normal Work Hours; 52.000-4949, Contractor Access to DPG; and 52.223-4001, OSHA Standards. All quotes must be emailed to Sandy Johnson at sandra.j.johnson90.civ@mail.mil in either Microsoft Office or Adobe Acrobat PDF format. For any questions or concerns you may email Sandy Johnson at sandra.j.johnson90.civ@mail.mil. Quotes are due no later than 5:00 PM (prevailing local time at U.S. Army Dugway Proving Ground, Utah), Wednesday, August 31, 2011. ITEMIZED LIST ITEM 1: 50 Liter Jacketed Process Reactor System, Short, Electric Motor. Special Note: Overall height must be below 80". Complete Setup Includes (quantity is one unless listed otherwise) (Chemglass Referenced Part Numbers): High Efficiency Condenser, 45/50 (CG-1215-C-10) 25.4mm Stirrer Shaft, 44 7/8" OAL (CG-2097-51) 25.4mm Stir Bearing, Mechanical Seal, Body Only (CG-2077-M-04) 45/50 Lower Joint Adapter (CG-2077-M-32) 80mm Domed Head (CG-149-06) S.S. Quick Release Clamp for 80mm Schott Flange, Teflon Coated (CG-141-T-10) 80mm FEP Encapsulated S.S. Spring O-Ring (CG-14-79) Teflon Envelope Gasket (CG-1968-G-01) 50L Jacketed Reaction Vessel, Short, 2" Beaded Pipe Detachable (CG-1968-95) 1" Beaded Pipe to M16 x 1 Male Thread S.S. Adapter (CG-1969-A-05), oQuantity: 2 1" Beaded Pipe Coupling (CG-1968-66), oQuantity: 3 2" Beaded Pipe Coupling (CG-1968-67) Horizontal Electric Stir Motor, Hp, 500 RPM (CG-2033-13) Stir Motor Controller (CG-2033-31) 25.4mm Coupling Assembly for Electric Motor (CG-2046-90) " OD S.S. Rod, Bent 90 (CG-3498-03) Large Universal Kwik Mount Klamp (CG-9253-20) " Thermocouple Adapter, 45/50 (CG-1042-E-10) 7-Neck Reaction Vessel Head, 300mm Schott Flange, 1-CN 45/50, 1-SN 80mm Schott O-Ring Flange (CG-1968-A-01) PT100 Sensor, " OD x 32" Lgth, PFA Coated, 12 ft. Lead, Lemo Connector Strain Relief Spring (CG-1978-P32) 8" Teflon Agitator, Blades Angled 60 (CG-2095-23) 10" High Viscosity Teflon Agitator (CG-2096-12) New Open Support Frame, 75.5" OAH without Motor (CG-1968-X-12) High Flow Manifold System with Hard Connect Fittings, M30 Circulator Size End Fitting, 1" Beaded Pipe Triple Insulated Flexible Hose, -60 to 200 C Temperature Range (CG-1969-M-06) Side Support Shelf, for CG-1968-X Style Support Frame (CG-1968-X-50) Zero Dead Space Drain Valve (CG-1968-Q-01) GFTFE Adapter, 1" Beaded Pipe to " Compression Fitting (CG-1964-50) Adapter, Distilling/Splitting, 45/50, 0-12mm Valve, " Compression Fitting (CG-1235-A-45) Large TFE Spray Ball, 35mm Ball O.D., for use with " Teflon Tubing (CG-1989-03) Adapter, Spray Ball, " Compression Fitting, 45/50 Inner (CG-1989-15) FEP Tubing, " OD x 1/8" ID, 10' Packaged in a Box (CG-1975-01) 25.4mm Safety Collar (CG-2048-03) Beam Torque Wrench (CG-1963-B-10) 7/16" Deep Socket, 6 Point, " Drive (CG-1963-B-14) ITEM 2: Large Gas Scrubber Setup, Mobile Support Stand. Special Note: The transfer line to transfer gas from the 50 liter reactor to the scrubber has to be big enough without a back pressure; diameter has to be 1" or above. Complete Setup Includes (quantity is one unless listed otherwise) (Chemglass Referenced Part Numbers): 20 Liter Lower Reservoir, Full Jacket, 4 Neck, 100mm Flat O-Ring Flange CN, 2-Angled 45/50 Outer joint SN, Angled 60mm Flat O-Ring Flange SN, 1" Beaded Pipe on Inlet/Outlet, Offset 0-14mm Lower Drain Valve, similar to CG-1830-12 (USAD-1107-141LP) Large Column, Absorption, 100mm Flat O-Ring Flange on Top, 110mm O.D. Body, Lower Indentation to Support Perforated Teflon Disc, 100mm Flat Flange on Bottom, Similar to CG-1830-13 (USAD-1107-063LP) Packing Support, Glass-Filled Teflon, Similar to CG-1830-14 (USAD-1107-064LP) Rings, Rasching, 8mm x 8mm oQuantity: 3 Column, Exhaust Gas Outlet, 100mm Flanges, 24/40 Outer Joint on Side, Similar to CG-1830-15 (USAD-1107-065LP) Adapter, Shower Head, 100mm Flat Flange, " Swagelock on Side, Similar to CG-1830-16 (USAD-1107-066LP) 60mm Domed Cap (CG-149-01) 60mm Quick Release Clamp, Teflon Coated (CG-141-T-11) 60mm Teflon Envelope Gasket (CG-147-G-01) 100mm Quick Release Clamp, Teflon Coated (CG-141-T-12) oQuantity: 3 100mm Teflon Envelope Gasket (CG-147-G-03) oQuantity: 3 Clamp, Reactor Support, 100mm (CG-1947-A100) Large Coil Condenser, 80mm O.D. x 400mm Body Length, " Swagelock on Top and Bottom, CG-300-01 Hose Connection on Inlet/Outlet, Similar to CG-1830-30 (USAD-1107-067LP) Adapter, Gas Inlet, Style "A", Extra Coarse Frit, 1" O.D. Top Port, Similar to CG-1830-18 (USAD-1107-068LP) Stand Assembly, Mobile, Bench-top Process Reactor, Stainless Steel and Teflon Coated, Similar to CG-1965-X-150 (USAD-1107-142LP) Pump, Liquid Transfer, PTFE Diaphragm, 0.5 to 3L/min, " Compression Fitting (CG-1171-20) PTFE Tubing, " OD x 1/8" ID, 10' Long (CG-1975-01) PTFE Tubing, " OD x 3/8" ID, 10' Long (CG-1975-03) " to " PFA Compression Fitting (CG-1975-21) oQuantity: 4 " to " PFA Compression Fitting (CG-1972-20) oQuantity: 2 Small Kwik Mount Klamp (CG-9253-10) Small Chain Clamp (CG-9220-01) ITEM 3: Circulator for Reactor System. Special Note: Application - 50 Liter Reactor Temperature Range RT to 60 C = 41 min.; RT to -10 C = 34 min. Complete Setup Includes (quantity is one unless listed otherwise) (Chemglass Referenced Part Numbers): Circulator, Unistat, 510w, Water Cooled, -50 to 250 C Temperature Range, 6.0kW Heating Power, 2.8kW Cooling Power @ -20 C, M30 Pump Fitting, 208V 3 Phase, 60 Hz (CG-1978-U593) M30 S.S 90 Elbow, Huber, Male to Male (CG-1969-M-28) oQuantity: 4 Hose, Insulated, Huber, M30 Female End Fittings, 3.0m Length (CG-1978-H128) oQuantity: 2 M30 S.S. Ball Valve, Huber, Male to Female (CG-1969-M-26) oQuantity: 4 Bath Fluid, Unistat, Huber, DW-Therm, -90 to +200 C, 10L Container (CG-1978-F180) oQuantity: 4 Huber Installation and Training, 1-Day
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/148434fd9db600aa88a6d92bc283a097)
 
Place of Performance
Address: MICC - Dugway Proving Ground Division of Contracting, Building 5330 Valdez Circle Dugway UT
Zip Code: 84022-5000
 
Record
SN02566878-W 20110910/110908235544-148434fd9db600aa88a6d92bc283a097 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.