Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 10, 2011 FBO #3577
SOLICITATION NOTICE

70 -- USDA OIG Compellent Upgrade - Package #1

Notice Date
9/8/2011
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
518210 — Data Processing, Hosting, and Related Services
 
Contracting Office
General Services Administration, Federal Acquisition Service (FAS), Assisted Acquisition Services Division (4QFA), 401 West Peachtree ST NW, Ste 2700, Atlanta, Georgia, 30308, United States
 
ZIP Code
30308
 
Solicitation Number
4QAP12112804
 
Archive Date
10/4/2011
 
Point of Contact
Joy M. Everett, Phone: (404) 224-2360, Donna M. Rounds, Phone: (404) 331-7837
 
E-Mail Address
joy.everett@gsa.gov, donna.rounds@gsa.gov
(joy.everett@gsa.gov, donna.rounds@gsa.gov)
 
Small Business Set-Aside
N/A
 
Description
J&A Past Performance Questionnaire Bid Terms BOM Upgrading two Compellent SANs (Storage Area Networks). The first System is located at 8930 Ward Parkway, Kansas City, MO 64114 and the second is located at 1400 Independence Ave. SW, Washington, DC 20250. The upgrade should be able to be performed in one working day per site. The Contractor will also be responsible for physically installing the solution in a pre-existing Standard 42U Rack during a USDA OIG Saturday Maintenance Window. DELIVERY MUST BE MADE BY SEPTEMBER 27, 2011.. The Government may make no award(s) and cancel this Request for Quote if delivery date, pricing and/or other considerations are not favorable or meet the Government's needs. Please specify quantities and delivery dates in your quote. Upon delivery, all shipping documents and equipment containers will include GSA-IT order number and/or Act number. All hardware must be original Compellent hardware that is compatible with the existing Compellent SAN. All switch hardware must be compatible with existing Brocade Switch(s). All Software must be Compellent software that will allow all hardware to function with existing Compellent software. All Maintenance/Support for this equipment must terminate on 9/27/2011 to be Co-Terminus with our existing Compellent SAN Support Contracts. There will be PDUs/Power strips provided by OIG to supply power to the new equipment. Cable installation should not interfere with any currently cabled systems that reside in the same rack where the new cabling will be installed. All cabling that connection systems must be properly secured and directed in the existing rack provided. All cabling used to interconnect the upgraded equipment will meet current system requirements and specifications. All Power, Network, and Backend Fiber cabling must be labeled to make sure it is consistent with existing labeling. Upon completion all systems must be tested and approved by USDA OIG staff to ensure proper installation and configuration have been completed. After Testing and verification, full documentation of procedures and any material relevant to the upgrade of this system will be transferred from Contractor to OIG Staff. See attached Bill of Materials and Bid Terms for details.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/f1c3222ddd02fedf430707b9cfb8d3f0)
 
Place of Performance
Address: 8930 Ward Parkway, Kansas City, Missouri, 64114, United States
Zip Code: 64114
 
Record
SN02566774-W 20110910/110908235427-f1c3222ddd02fedf430707b9cfb8d3f0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.