Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 09, 2011 FBO #3576
SOLICITATION NOTICE

60 -- cable assembly

Notice Date
9/7/2011
 
Notice Type
Presolicitation
 
NAICS
335921 — Fiber Optic Cable Manufacturing
 
Contracting Office
DEPARTMENT OF THE AIR FORCE; OO ALC GHGK MUNITIONS;6033 ELM LNBLDG 1247; HILL AIR FORCE BASE; UT; 84056
 
ZIP Code
84056
 
Solicitation Number
FA8251-11-Q-81053
 
Response Due
9/27/2011
 
Point of Contact
Julie Barney, Phone 801-775-3870, Fax 801-777-0389, Emailjulie.barney@hill.af.mil
 
E-Mail Address
Julie Barney
(julie.barney@hill.af.mil)
 
Small Business Set-Aside
N/A
 
Description
PR Number(s): FD20201181053Item: 0001NSN: 6020015736544NM cable assemblyP/N: 200535512-10, Alt P/N: 2005082401WR-02, Description: : 0.0000 Applicable to: NoneDestn: FMS COUNTRIES. Item: 0001AAFirst Article Test Report Data Description: Quantity: 1.0000 LO Destn: FMS COUNTRIES. Item: 0001ABFIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE Description: Quantity: 1.0000 EA Destn: FMS COUNTRIES. Item: 0001ACPRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE Description: Quantity: 1.0000 EA Destn: FMS COUNTRIES. Item: 0001ADPRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE Description: Quantity: 2.0000 EA Destn: FMS COUNTRIES. Plus 0000 additional items Duration of Contract Period:. Electronic procedure will be used for this solicitation. All responsible sources may submit a capability statement, proposal, orquotation, which shall be considered by the agency. First article test required.Award will be made only if the offeror, the product/service, or themanufacturer meets qualification requirements at the time of award inaccordance with FAR clause 52.209-1. The solicitation identifies theoffice where additional information can be obtained concerningqualification requirements are cited in each individual solicitation.This part required engineering source approval by the design controlactivity in order to maintain the quality of the part. Existing uniquedesign capability, engineering skills, and manufacturing knowledge bythe qualified source(s) require acquisition of the part from theapproved source(s). The approved source(s) retain data rights,manufacturing knowledge, or technical data that are not economicallyavailable to the Government, and the data or knowledge is essential tomaintaining the quality of the part. An alternate source must qualifyin accordance with the design control activity's procedures, as approvedby the cognizant Government engineering activity. The qualificationprocedures must be approved by the Government engineering activityhaving jurisdiction over the part in the intended application.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OOALC/FA8251-11-Q-81053/listing.html)
 
Record
SN02566395-W 20110909/110908000514-c1219053553ef8e5849e6507efd351e7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.