Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 28, 2011 FBO #3564
AWARD

Y -- RECOVERY--Y-- PROJECT NUMBER 69798, Site Work Improvements, Fort Bragg, NC

Notice Date
8/26/2011
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Savannah, Attn: CESAS-CT, PO Box 889, Savannah, Georgia, 31402-0889, United States
 
ZIP Code
31402-0889
 
Archive Date
9/10/2011
 
Point of Contact
Craig R. Stiller, Phone: 9126526211
 
E-Mail Address
craig.r.stiller@usace.army.mil
(craig.r.stiller@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9126G-08-D-0053-000213
 
Award Date
8/26/2011
 
Awardee
BL Harbert International, LLC
 
Award Amount
$298,466.00
 
Description
RECOVERY - PER FAR 5.7 THE NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): W9126G-08-D-0053-0002, BL HARBERT INTERNATIONAL, LLC. This is not a solicitation. WT Barracks, Fort Bragg, NC. Contract Number W9126G-08-D-0053, Task Order 0002, Modification Number 13 consists of the following: Remove existing pavement and subgrade for Half Street as needed to provide new base course and asphalt in accordance with Contract Drawings P-1, Plate DT-100-R1, detail for heavy-duty flexible pavement section. Elevations for east side of Half Street shall match grades of existing curb and gutter to facilitate positive drainage. Landscape adds and deletes. Lastly, add 12-foot wide sidewalks to connect WT Barracks Complex with existing sidewalk at Womack Army Medical Center. A dd thermoplastic crosswalks for all road crossings. All sidewalks and crosswalks must be contained in the shaded area. All sidewalks, crosswalks, and slopes shall be in accordance with RFP Section 01 10 00, Paragraph 3.3.1 Walks as well as in compliance with ADA Standards for Accessible Design. Subject sidewalks are to be used by pedestrians as well as electrical vehicle travel with delineated lanes of 4 feet and 8 feet respectively. Install a solar-powered, pedestrian-actuated flashing light with pedestrian crossing sign on each side of Loop Road where the crosswalk is installed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/Awards/W9126G-08-D-0053-000213.html)
 
Record
SN02551422-W 20110828/110826235537-0352de34f820f3e103fe04f5b96cbb3b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.