Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 06, 2011 FBO #3542
SOLICITATION NOTICE

99 -- Hydraulic Bollards (Stainless Steel) W/LED light ring 250 mm diameter/750 mm ht/149 kg wt/13 mm thickness cast steel.

Notice Date
8/4/2011
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
561210 — Facilities Support Services
 
Contracting Office
USPFO for DC, 189 Poremba Ct., Anascostia Naval Air Station, Washington, DC 20315-0350
 
ZIP Code
20315-0350
 
Solicitation Number
W912R1-11-T-0015
 
Response Due
8/16/2011
 
Archive Date
10/15/2011
 
Point of Contact
Chanel Wilson, 202-685-7855
 
E-Mail Address
USPFO for DC
(chanel.wilson@dc.ngb.army.mil)
 
Small Business Set-Aside
N/A
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. STATEMENT OF WORK Installation of Automatic Retractable Bollards 1. Introduction and Overview This statement of work will be issued to a contractor to install automatic retractable bollards and control center at the DC Armory. 1.1 Background To remove existing barrier, install control center and 4 automatic retractable bollards on the loading dock at the DC Armory. 1.2 Scope of work The contractor shall install a control center and 4 automatic retractable bollards on the loading dock located on the southwest side of the building to prevent unauthorized vehicles from entering the building. All components will be factory original, and installation will be performed by certified factory personnel. The 3 main components are: Security loops (electro-magnetic detection): they are buried in the ground on either side of the bollards and represent a security perimeter around them. The excavation will be 4 ft (54in) deep and run the width of the roadway. Geotextile will be placed in the lower part of the excavation, and then filled up with about 250 mm of ballast (pebbles). The casing is then lowered into position and backfilled with concrete. The hydraulic components and the stainless bollards will been be mounted in place and connected for operation. Automatic retractable bollards are installed on vehicular drive track; they authorize or forbid access (one or several bollards per access site). The management system (access controller) with built-in automation (CITY-type controller, technical centre or armoured cabinet), to command the bollards. The contractor will report directly to MSG Wilson. The contractor will ensure the equipment works properly. All questions are due no later than 8 August 2011 @ 4:00 pm eastern standard time. Questions should be e-mailed to chanel.wilson@dc.ngb.army.mil. All questions will be answered by 10 August 2011 by 4:00 pm eastern standard time. All quotes are due by 16 August 2011 @ 3:00 pm eastern standard time. The POC will be Chanel Wilson she can be reached at (202)685-7855.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA49/W912R1-11-T-0015/listing.html)
 
Place of Performance
Address: District of Columbia Army National Guard 2001 East Capitol Street Washington DC
Zip Code: 20315-0350
 
Record
SN02522980-W 20110806/110805000057-e02580b1562b0dfa19a32545ef5ec98d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.