Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 08, 2011 FBO #3513
MODIFICATION

Z -- Lower Brownsville, Reach #5: Rehabilitation of Donna Pump to Brownsville Levee

Notice Date
7/6/2011
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
International Boundary and Water Commission, Information Management Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902
 
ZIP Code
79902
 
Solicitation Number
IBM11B0004
 
Point of Contact
Hugo E. White, Phone: 9158324711, Ruben Pino, Phone: 915-832-4126
 
E-Mail Address
hugo.white@ibwc.gov, ruben.pino@ibwc.gov
(hugo.white@ibwc.gov, ruben.pino@ibwc.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
General Description of the Work - The Work for this project generally consists of rehabilitation of an approximately 12.5 mile reach ( Sub-reach No.5 ) of an overall 65 miles of the Donna Pump to Brownsville levee system in order to meet the Federal Emergency Management Agency's (FEMA) Levee Certification Requirements of National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). Major Construction Tasks -( 1) Preparation of right of way (clearing and grubbing) (2) Improvement of existing top of levee (3) Construction of Flex Base (4) Construction of ramps (5) Install seeding for erosion control on the sideslopes of the levee (6) Replacement of sluice gate assemblies inside existing gatewell structures (7) Cleaning and removing debris from openings of culverts, and inlet and outlet structures of the existing gatewell systems. (8) Construction of a 3-foot deep cutoff wall under roadway. Length of the Reach is Approximately 12.5 miles. The magnitude of this project is between $10 million and $12 million. Performance Period - All levee work, excluding maintenance of seeding, shall be completed within four hundred-f ifty (450) calendar days; and all maintenance of seeding shall be completed within one- hundred twenty (120) calendar days of completion of all other levee work. This is a 100% SMALL BUSINESS SET-ASIDE.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/IBM11B0004/listing.html)
 
Place of Performance
Address: Donna Pump to Brownsville levee - Hidalgo and Cameron Counties, Tx., Mercedes, Texas, United States
 
Record
SN02491124-W 20110708/110706235342-83eeb81dc8e770dd2277a840599d2bb5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.