MODIFICATION

Y -- IRON CREEK SUBDIVISION ROAD REALIGNMENT PROJECT - Package #1

Notice Date
7/6/2011
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Forest Service - R-4 SW Idaho/Nevada Acquisition Office
 
ZIP Code
00000
 
Solicitation Number
AG-0261-S-11-0062
 
Archive Date
8/16/2011
 
Point of Contact
Matthew A. Morris, Phone: 2083734166, KEVIN DUCHOW, Phone: (208) 737-3318
 
E-Mail Address
mamorris@fs.fed.us, KDUCHOW@FS.FED.US
(mamorris@fs.fed.us, KDUCHOW@FS.FED.US)
 
Small Business Set-Aside
N/A
 
Description
Wage Determination Drawings Specifications SOW Solicitation IRON CREEK SUBDIVISION ROAD REALIGNMENT PROJECT -- SAWTOOTH SNRA By 8 July 2011, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT. The intent of the contract is to furnish all labor, equipment and material, to accomplish the work under this contract. This project proposes to reconstruct a small segment of Forest Road 70619, to eliminate a limited strength area prior to any haul of materials with the installation of an underdrain & reinforced embankment, then to construct the realigned segment of Forest Road 70692 at an approximate length of 0.42 mile, also construct a new bridge at the Iron Creek Crossing on this realigned segment. The beginning of the new construction starts at approximately 0.10 mile from the junction of Forest Roads 70619 and 70692, with the new construction ending at the Iron Creek Subdivision. Work includes but is not limited to the following major items; construction survey & staking for both road & bridge, erosion prevention & control measures, clearing & grubbing, excavation & embankment construction, haul, aggregate placement, reinforced fill & underdrain construction, culvert installation, asphalt placement, bridge construction with structural backfill & approach railing. LOCATION AND DESCRIPTION From Stanley Idaho proceed west approximately 3 miles on Idaho State Road #21 to the junction with Forest Road 70619. Turn left onto Forest Road 70619; proceed to beginning of first project site on Forest Road 70619. The existing segment of the project on Forest Road 70619 which requires the installation of a reinforced embankment & underdrain, begins approximately at 0.20 to 0.25 mile from the junction of Forest Road 70619 and Idaho State Road #21. Exact Area of Work will be located & marked on the ground by both the Government & Contractor, then designated in Writing by the Contracting Officer prior to excavation. The relocated segment of the project on Forest Road 70692 begins approximately at 0.10 mile from the junction of Forest Roads 70619 and 70692, with the new construction ending at the Iron Creek Subdivision. CONTACT KEVIN DUCHOW (208) 737-3318 FOR MORE INFORMATION. ESTIMATED PRICE RANGE - Between $250,000 and $500,000 CONTRACT TIME WILL BE 200 calendar days with an estimated start date of Aug 15, 2011. NAICS Code: 237990 Size Standard: $33.5 This proposed procurement is full and open.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-11-0062/listing.html)
 
Place of Performance
Address: STANLEY, Idaho, United States
 
Record
SN02490328-W 20110708/110706234532-654f484842b194035f55dff19eb74fd7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.