Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 12, 2011 FBO #3487
DOCUMENT

Z -- Correct Boiler Plant Deficiencies 100% SDVOSB Set a Side Please Review the Attached SOW for further Details The Solicitation will be Posted in 15 Days - Attachment

Notice Date
6/10/2011
 
Notice Type
Attachment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Veterans Affairs;VAMC Bedford;200 Springs Road;Bedford MA 01730
 
ZIP Code
01730
 
Solicitation Number
VA24111RP0834
 
Response Due
7/26/2011
 
Archive Date
8/25/2011
 
Point of Contact
David Bullerwell
 
E-Mail Address
rings
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Article I.SCOPE OF WORK 1.PROJECT DATA: TITLE: Ceiling Lift Site Prep FY11 BUILDING/FACILITY: Various patient rooms and patient therapy locations in buildings 2,4,62 and 78 at the Bedford VAMC. PROJECT NO: 518-11-108SPH CONSTRUCTION DURATION: 180 Days 2.GENERAL SCOPE: Furnish all labor, materials, and supervision to perform work to facilitate modifications in patient rooms to prepare the areas for patient lift installations as required by specifications. 3.DETAILED REQUIREMENTS: A. Contractor preparing rooms for ceiling lifts will be required to work closely to establish a work schedule with the ceiling lift installation company to ensure smooth transitioning between phases. B.Work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and construction at the specified locations to include the following: ROOM LOCATIONS AND SPECIAL INSTRUCTIONS: Ward 2B - Mobilization to six (6) locations General Note For This Area: Rooms located within this ward have two (2) layers of reinforced plaster ceilings above the existing suspended ceiling which will require the contractor to remove. Demolition will require selective removal of existing plaster ceilings at all room locations to receive installation of patient lifts as determined by Veteran Administrations COTR and patient lift installers. Allow for an area of (64) sixty-four square feet to be removed at each room in Ward 2B. Contractor shall be responsible to coordinate with the ceiling lift installation company to establish exact location of ceiling to be removed. Room 343: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Ward 2B Continued ¦ Room 352: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 353: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 356: Provide and install one (1) duplex outlet. Room 364: Provide and install two (2) duplex outlets, modify patient privacy curtain at two (2) locations to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate one (1) pendant style fire sprinkler. Room 365: Provide and install one (1) duplex outlet, modify patient privacy curtain to allow unrestricted movement of new patient lift (privacy curtain track to remain) Ward 2C (Hospice Unit) - Mobilization to ten (10) locations General Note For This Area: This area is currently under renovation and is slated to receive hard ceilings as part of the construction. Demolition will require selective removal of existing gypsum wall board on ceilings at all room locations to receive installation of patient lifts as determined by Veteran Administrations COTR and patient lift installers. Allow for an area of (30) thirty square feet of Gypsum Wall Board to be removed at each room in Ward 2C. Contractor shall be responsible to coordinate with the ceiling lift installation company to establish exact location of ceiling to be removed. Room 310: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 311: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 312: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 313: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 315: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 316: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Ward 2C (Hospice Unit) continued ¦ Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 317: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 318: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 319: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Room 320: Remove existing Gypsum Wall Board Ceiling to expose concrete deck above to provide access to ceiling for lift installers to suspend Patient Lift Track. Said area for demolition shall be determined by Patient Lift Installation Company. Patch, prime and paint previously removed sections of Gypsum Wallboard Ceiling after installation of Patient Lift Track System to match existing. Provide and install one (1) duplex outlet. Ward 4A - Mobilization to seven (7) locations Room 156: Provide and install one (1) duplex outlet. Room 163: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 165: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 172: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 173: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 178: Provide and install one (1) duplex outlet, modify patient privacy curtain to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate one (1) pendant style fire sprinkler. Room 184: Provide and install one (1) duplex outlet, modify patient privacy curtain to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate two (2) pendant style fire sprinklers. Ward 4B - Mobilization to nine (9) locations Room 101: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Ward 4B Continued ¦ Room 103: Provide and install two (2) duplex outlets. Room 108: Provide and install one (1) duplex outlet, relocate one (1) HVAC Supply Diffuser. Room 110: Provide and install one (1) duplex outlet, modify patient privacy curtain at two (2) locations to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 122: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 123: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate two (2) pendant style fire sprinklers. Room 130: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate two (2) pendant style fire sprinklers. Room 131: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 136: Provide and install two (2) duplex outlets, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate one (1) pendant style fire sprinkler. Ward 4C - Mobilization to ten (10) locations Room 258: Provide and install one (1) duplex outlet, relocate one (1) HVAC Supply Diffuser, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift. (privacy curtain track to remain) Room 259: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 263: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 265: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 273: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate two (2) pendant style fire sprinklers. Room 277: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 278: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 285: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate one (1) pendant style fire sprinkler. Ward 4D - Mobilization to nine (9) locations Room 202: Provide and install two (2) duplex outlets, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate one (1) pendant style fire sprinkler. Room 204: Provide and install one (1) duplex outlet. Room 207: Provide and install one (1) duplex outlet. Room 226: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 227: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 234: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate two (2) pendant style fire sprinklers. Room 237: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate two (2) pendant style fire sprinklers. Room 239: Provide and install one (1) duplex outlet, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 240: Provide and install one (1) duplex outlet. Ward 62A - Mobilization to two (2) locations Room 129: Provide and install one (1) duplex outlet, relocate one (1) ceiling fan, remove one (1) 2'x4' fluorescent light fixture, provide and install one (1) 2'x2' fluorescent light fixture. Note: No patient privacy track or curtain to be installed-Room is of inadequate size for this provision. Room 134: Provide and install one (1) duplex outlet, relocate one (1) ceiling fan. Ward 62B - Mobilization to two (2) locations Room 129: Provide and install one (1) duplex outlet, relocate one (1) ceiling fan, remove one (1) 2'x4' fluorescent light fixture, provide and install one (1) 2'x2' fluorescent light fixture, remove existing patient privacy track and curtain, provide and install new patient privacy track and curtain (to be installed after installation of patient lift). Room 143: Provide and install one (1) duplex outlet, relocate one (1) ceiling fan. Note: No patient privacy track or curtain to be installed-Room is of inadequate size for this provision. Ward 62C - Mobilization to two (2) locations Room 206/207: Provide and install one (1) duplex outlet, relocate one (1) pendant style fire sprinkler. (Same Location)Note: No patient privacy track or curtain to be installed-Room is of inadequate size for this provision. Room 208: Provide and install one (1) duplex outlet, remove two (2) 1'x4' fluorescent lighting fixtures, provide and install one (1) 2'x2' fluorescent lighting fixture, remove existing patient privacy track and curtain, provide and install new patient privacy track and curtain (to be installed after installation of patient lift). Ward 62C Continued ¦ Room 212: Provide and install one (1) duplex outlet, relocate one (1) 2'x2' fluorescent lighting fixture, relocate one (1) wall mounted oscillating fan bracket, relocate one (1) pendant style fire sprinkler. Note: No patient privacy track or curtain to be installed-Room is of inadequate size for this provision. Ward 62D - Mobilization to one (1) location Room 229: Provide and install one (1) duplex outlet, remove one (1) 2'x4' fluorescent lighting fixture, provide and install one (1) 2'x4' fluorescent lighting fixture, remove existing patient privacy track and curtain, provide and install new patient privacy track and curtain (to be installed after installation of patient lift). Building 78 Physical Therapy / Occupational Therapy Room (second floor) - Mobilization to one (1) location Room 227BProvide and install two (2) duplex outlets, remove four (4) 2'x4' fluorescent lighting fixture, provide and install four (4) 2'x2' fluorescent lighting fixture, relocate one (1) existing 2'x2' fluorescent lighting fixture, remove approximately fifty (50) linear feet of existing patient privacy track (no longer utilized), relocate two (2) pendant style fire sprinklers, relocate existing parallel bar setup one (1) foot to the south and one (1) foot to the east. Ward 78C - Mobilization to six (6) locations Room 245: Provide and install two (2) duplex outlets, relocate two (2) 2'x2' fluorescent lighting fixtures, modify patient privacy curtain at one (2) locations to allow unrestricted movement of new patient lift (privacy curtain track to remain), relocate four (4) pendant style fire sprinklers. Room 247: Provide and install one (1) duplex outlet, provide and install new patient privacy track and curtain (to be installed after installation of patient lift), relocate one (1) pendant style fire sprinkler. Room 269: Provide and install two (2) duplex outlets, relocate one (1) 8" diameter 'can' lighting fixture, relocate one (1) pendant style fire sprinkler. Room 270: Provide and install one (1) duplex outlet, relocate one (1) 8" diameter 'can' lighting fixture, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) Room 271: Provide and install one (1) duplex outlet, relocate one (1) 8" diameter 'can' lighting fixture. Room 272: Provide and install two (2) duplex outlets, relocate two (2) 8" diameter 'can' lighting fixture, modify patient privacy curtain at one (1) location to allow unrestricted movement of new patient lift (privacy curtain track to remain) ***END OF SCOPE OF WORK***
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BeVAMC518/BeVAMC518/VA24111RP0834/listing.html)
 
Document(s)
Attachment
 
File Name: VA-241-11-RP-0834 VA-241-11-RP-0834_1.doc (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=208876&FileName=VA-241-11-RP-0834-000.doc)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=208876&FileName=VA-241-11-RP-0834-000.doc

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Department of Veterans Affairs;VAMC Bedford;200 Springs Road;Bedford MA
Zip Code: 01730
 
Record
SN02469915-W 20110612/110610235303-313eb8375eb1b0c77338acbfd68423af (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.