Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 04, 2011 FBO #3479
SOLICITATION NOTICE

Z -- Cordell Hull Dam Tainter Gates Painting

Notice Date
6/2/2011
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Nashville, P.O. Box 1070, 801 Broad Street, Nashville, TN 37202-1070
 
ZIP Code
37202-1070
 
Solicitation Number
W912P5-11-B-0011
 
Response Due
6/17/2011
 
Archive Date
8/16/2011
 
Point of Contact
Ray Kendrick, 615-736-7932
 
E-Mail Address
USACE District, Nashville
(ray.kendrick@us.army.mil)
 
Small Business Set-Aside
HUBZone
 
Description
DESCRIPTION: The Nashville District U.S. Army Corps of Engineers (USACE) intends to issue an invitation for bid (IFB), W912P5-11-B-0011 for the Cordell Hull Dam Tainter Gates Painting located in Carthage, Tennessee. Cordell Hull Dam is located at river mile 313.50 on the Cumberland River in Carthage, Tennessee. The Cordell Hull Project is comprised of a navigation lock, a powerhouse, an embankment, and a spillway section. The spillway section consists of 5 tainter type steel gates each 41 feet tall by 45 feet wide mounted on concrete spillway piers. The gates are operated by overhead machinery. The spillway section also includes an overhead gantry crane which is used to move unwatering bulkheads for performing maintenance on the gates. The project includes only enough bulkheads to unwater one gate at a time. The work covered by this contract includes surface preparation and coating of spillway gates at Cordell Hull Dam. All surface areas shall be painted with the epoxy paint system specified in the contract. The Contractor shall assume that the tainter gates and all appurtenant area are free of lead base paint. The Contractor shall also remove and dispose of all wood, tires, buoys or other debris collected on the gates. The Contractor shall provide all materials, equipment, and labor necessary to complete the work and ensure that the spillway gates and appurtenant areas are clean and ready for operation. The Contractor shall also be responsible for disposing of any materials removed from the gates during this work. All work shall be field performed and must be done with water load removed from the gate. All work shall be accomplished in accordance with the procedures prescribed in the contract specifications and drawings. ANTICIPATED SOLICITATION RELEASE DATE: The anticipated release date for IFB W912P5-11-B-0011 is on or about June 20, 2011.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA62/W912P5-11-B-0011/listing.html)
 
Place of Performance
Address: USACE District, Nashville P.O. Box 1070, 801 Broad Street Nashville TN
Zip Code: 37202-1070
 
Record
SN02462767-W 20110604/110602235010-395b74d6f7c183587adaa5b50272ed9a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.