Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 21, 2011 FBO #3435
SOLICITATION NOTICE

H -- Waste Water Treatment Plant Operator Services

Notice Date
4/19/2011
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
221320 — Sewage Treatment Facilities
 
Contracting Office
Department of Labor, Employment Training Administration, Kittrell Job Corps Center, 1096 U.S. Highway, #1 South, P.O. Box 219, Kittrell, North Carolina, 27544
 
ZIP Code
27544
 
Solicitation Number
WWTPKITTRELL2011
 
Archive Date
6/4/2011
 
Point of Contact
Kimberly E Bray, Phone: 2524386161
 
E-Mail Address
kbray@del-jen.com
(kbray@del-jen.com)
 
Small Business Set-Aside
N/A
 
Description
SCOPE OF WORK 1. The service of the Contractors will be made available to the Center as follows: •a. Operation: Contractors will operate the WWTP, conduct preventive maintenance and operate certified field laboratory including on-site analysis of flow, dissolved oxygen, total residual chlorine, temperature and PH to meet all permit requirements. Contractors will sample all other parameters and send to contract lab for analysis. The Center will be responsible for payment of contract lab fees. •b. Maintenance: Contractors will require access to all grease removal systems within Kittrell Job Corps Center for visual inspection. The Center will have scheduled routine cleaning of grease removal systems and upon Contractor's request. •c. Contractors will prepare SOP's, record sheets, log books, preventive maintenance records and DMR report forms. •d. Contractors will use only qualified personnel; will visit WWTP on a daily average of two hours five days per week except holidays as mandated by the NC State Division of Water Quality and the Center's permit. Contractors may visit the WWTP on weekends if deemed necessary by the Contractors. Contractors will be available in case of emergency situations. •e. Contractors will provide telephone numbers to the Center Maintenance Manager and will respond to calls. Visits to the Center will be charged at the hourly rate. •f. Contractors will not be responsible for any fines unless they are due to proven neglect. Contractors will not be responsible for any third party lawsuits. •g. Contractors will provide maximum effort to see that all permit limits are met. •h. Contractors will be responsible for own insurance. The Center will be responsible for insurance for the facility. •i. Contractors will sign DMR forms as Operators in Responsible Charge (ORC) and fill out facility status section of DMRs. The Center is responsible for signing and mailing report to the Division of Water Quality. Contractors will submit completed DMR reports to the Center for signature and mailing by the twenty-sixth of each month. •j. Contractors own only equipment brought onto the Center. •k. Contractors will contact sludge hauler when needed, but the Center is responsible for sludge hauler payment. •l. Contractors will provide temporary sampling and testing equipment only. •m. Contractors are not owners of any part of the WWTP. •n. Contractors are responsible for their own bills.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOL/ETA/kittrelljcc/WWTPKITTRELL2011/listing.html)
 
Place of Performance
Address: 1096 US Hwy #1 South, Kittrell, North Carolina, 27544, United States
Zip Code: 27544
 
Record
SN02428595-W 20110421/110419235441-929b098f5ee0b51cf75a2bc7ef75191f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.