Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 21, 2011 FBO #3435
SOLICITATION NOTICE

Z -- Clearwater NF - Roads 108 & 568 Surfacing

Notice Date
4/19/2011
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-11-0057
 
Point of Contact
Gordon L Fitzwater, Phone: 2084768262
 
E-Mail Address
gfitzwater@fs.fed.us
(gfitzwater@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
The projects consist of preparing Roads 108 and 568 for driveable dip and inslope improvements. Work will consist of preparing the roads for aggregate placement by blading the surfaces while maintaining insloping according to plans, reconstructing existing driveable dips, cleaning ditches, and catchbasins. Then hauling approximately 3,600 CY of stockpiled aggregate from the Powell Pasture stockpile and placing on Road 108 for 5.0 miles with finish blading at 2-4% inslope and roller compaction. Road 568 (optional) will require up to 1,000 CY of stockpiled aggregate from Powell Pasture stockpile and will be used to spot gravel driveable dips and other locations approved by the CO in the field along its 3.8 mile length with a finish blading at 2-4% inslope and roller compaction. The Road 108 project is located approximately 8.0 miles West of Powell Ranger Station. The project begins at the start of Road 108 where it junctions with Hwy 12 and goes for 5 miles to where the road begins to leave the creek. Refer to the location map on the title sheet of the plans. The Road 568 project is located approximately 2.0 West of Powell Ranger Station. The project begins at the start of Road 568 where it junctions with Hwy 12 and goes for 3.8 miles to where the road leaves the East Fork of ‘Imnamatnoon Creek. Refer to the location map on the title sheet of the plans. Price estimate for the project is $100,000 - $250,000. All work must be completed October 31, 2011.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-11-0057/listing.html)
 
Place of Performance
Address: Clearwater National Forest, United States
 
Record
SN02428091-W 20110421/110419234902-5fdbaa0050c7dc47ef278f0cf82b3fd7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.