Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 03, 2011 FBO #3417
AWARD

47 -- Extension and relocation of water lines and installation of frost proof water hydrants at various locations in the Public Use Area of the Harry S. Truman Dam and Reservoir Project.

Notice Date
4/1/2011
 
Notice Type
Award Notice
 
NAICS
221310 — Water Supply and Irrigation Systems
 
Contracting Office
USACE District, Kansas City, ATTN: CENWK-CT, 700 Federal Building 60l East 12th Street, Kansas City, MO 64106-2896
 
ZIP Code
64106-2896
 
Solicitation Number
W912DQ-10-T-0111
 
Archive Date
5/1/2011
 
Point of Contact
James D. Kindle, 660-438-7317
 
E-Mail Address
USACE District, Kansas City
(james.d.kindle@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912DQ-11-C-0002
 
Award Date
3/30/2011
 
Awardee
LAROSE CONTRACTORS (789002891) <br> 636 PCR 917<br> PERRYVILLE, MO 63775-8348
 
Award Amount
$29,071.85
 
Description
a.The contractor shall furnish all labor, equipment, materials, supplies, transportation, security and supervision necessary to satisfactorily accomplish the work in accordance with this Scope of Work. b.The government will provide shop drawings of most sites where the work will take place. There are no "as built" drawings available. The government will locate and mark all electric lines in the area. The location of the frost proof hydrants will be marked but the exact point of excavation and path of the dig shall be up to the contractor. The contractor shall excavate the soil in a manner as not to damage the existing water lines. In the event of damage to the existing waterlines, due to the contractor's excavation, the contractor shall be responsible for all labor and repairs at no additional cost to the government. In the event the contractor cuts the asphalt roadway to install a water line the repairs to the roadway shall be with the existing overburden laid in 1 foot lifts with compaction completed before the next lift is started. The finial 6 inches of the repair shall be a hot asphalt patch which shall be rolled with a roller capable of providing compaction and finish to meet that of the existing asphalt roadway. c.The contractor shall extend the line using 1 inch PVC schedule 80 pipe and fittings. The line shall be installed at a minimum depth of 3 feet using industry standards in bedding and backfill. d.Frost proof hydrants shall be the four foot bury type with a four foot square area cribbed around the site using 6 inch by 6 inch treated wood.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA41/Awards/W912DQ-11-C-0002.html)
 
Record
SN02415384-W 20110403/110401234745-36d316a5c126e9672a6bb95c82a092ef (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.